Installation technical difficulties and countermeasures of large high-head hydroelectric sets installation
Li Jun
Abstract
Li Jun
Abstract
Combined with special structure characteristics of unit in Jinping Ⅱ Hydropower station, installation technical difficulties of large high-head hydroelectric set were analyzed, at the same time, countermeasures were put forward and have been applied. Time of installation was reduced; it created favorable conditions for the first batch hydro-generator units to make power generation ahead of schedule in Jinping ⅡHydropower Station
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with special structure characteristics of unit in Jinping Ⅱ Hydropower station, installation technical difficulties of large high-head hydroelectric set were analyzed, at the same time, countermeasures were put forward and have been applied. Time of installation was reduced; it created favorable conditions for the first batch hydro-generator units to make power generation ahead of schedule in Jinping ⅡHydropower Station
Key concepts: Hydropower, Hydroelectricity, Engineering, Schedule, Head (geology), Generator (circuit theory), Civil engineering, Unit (ring theory)