1980•Defense Technical Information Center (DTIC)Requires access

Effects of Flood Plain Encroachments on Peak Flow,

Johannes J. DeVries

Open publisher page 1 citations

Abstract

When land development encroachments into river flood plains are permitted, the magnitude of the flood peak discharge will be increased due to removal of flood plain storage. When the flood plain encroachment is limited (for example, when no more than one foot of water surface rise is permitted), the study results indicate that the increase in the flood peak is usually relatively small; it is generally less than 10 percent. The arrival time of the flood peak can be affected to a much greater extent, and in stream systems with significant tributary flows, consideration must be given to the effects of encroachments on the coinciding of the flood peaks. Various hydrograph shapes and mean river slopes were used in the investigation of encroachment effects. Both unsteady flow simulations and steady flow profile calculations with hydrologic routing were used in the analyses. (Author)

About this research paper

What this paper is about

When land development encroachments into river flood plains are permitted, the magnitude of the flood peak discharge will be increased due to removal of flood plain storage. When the flood plain encroachment is limited (for example, when no more than one foot of water surface rise is permitted), the study results indicate that the increase in the flood peak is usually relatively small; it is generally less than 10 percent. The arrival time of the flood peak can be affected to a much greater extent, and in stream systems with significant tributary flows, consideration must be given to the effects of encroachments on the coinciding of the flood peaks. Various hydrograph shapes and mean river slopes were used in the investigation of encroachment effects. Both unsteady flow simulations and steady flow profile calculations with hydrologic routing were used in the analyses. (Author)

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

When land development encroachments into river flood plains are permitted, the magnitude of the flood peak discharge will be increased due to removal of flood plain storage. When the flood plain encroachment is limited (for example, when no more than one foot of water surface rise is permitted), the study results indicate that the increase in the flood peak is usually relatively small; it is generally less than 10 percent. The arrival time of the flood peak can be affected to a much greater extent, and in stream systems with significant tributary flows, consideration must be given to the effects of encroachments on the coinciding of the flood peaks. Various hydrograph shapes and mean river slopes were used in the investigation of encroachment effects. Both unsteady flow simulations and steady flow profile calculations with hydrologic routing were used in the analyses. (Author)

Key concepts: Tributary, Flood myth, Floodplain, Hydrograph, Hydrology (agriculture), 100-year flood, Routing (electronic design automation), Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Effects of Flood Plain Encroachments on Peak Flow, — Research Paper | ScholarLens