2021IOP Conference Series Earth and Environmental ScienceOpen access

Discussion on Deviation Correction Technology of Long Borehole in Gas Drainage

Zunyu Xu

Open full text 2 citations

Abstract

Abstract To solve the drilling layer (especially small inclination to wear long borehole) deviation cause gas control drilling control range is not up to standard, large quantities and the problem of poor drainage effect in Xinji coal mine based on the analysis of borehole construction result in deviation in a variety of reasons, targeted in technology, management, system, equipment, and adopted a series of effective measures on the scene to “rectify”, puts borehole deflection can be controlled within the scope of reduced the drilling quantity, raise the drilling control ability, increase the gas control working time, realized the “technical economic integration”.

Open-access reader

About this research paper

What this paper is about

Abstract To solve the drilling layer (especially small inclination to wear long borehole) deviation cause gas control drilling control range is not up to standard, large quantities and the problem of poor drainage effect in Xinji coal mine based on the analysis of borehole construction result in deviation in a variety of reasons, targeted in technology, management, system, equipment, and adopted a series of effective measures on the scene to “rectify”, puts borehole deflection can be controlled within the scope of reduced the drilling quantity, raise the drilling control ability, increase the gas control working time, realized the “technical economic integration”.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract To solve the drilling layer (especially small inclination to wear long borehole) deviation cause gas control drilling control range is not up to standard, large quantities and the problem of poor drainage effect in Xinji coal mine based on the analysis of borehole construction result in deviation in a variety of reasons, targeted in technology, management, system, equipment, and adopted a series of effective measures on the scene to “rectify”, puts borehole deflection can be controlled within the scope of reduced the drilling quantity, raise the drilling control ability, increase the gas control working time, realized the “technical economic integration”.

Key concepts: Borehole, Drilling, Petroleum engineering, Drainage, Deflection (physics), Measurement while drilling, Coal mining, Scope (computer science)

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion on Deviation Correction Technology of Long Borehole in Gas Drainage — Research Paper | ScholarLens