2005•RePEc: Research Papers in EconomicsOpen access

Beam search algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setups

Jorge M. S. Valente

Open full text 15 citations

Abstract

In this paper, we consider the single machine weighted tardiness scheduling problem with sequence-dependent setups. We present heuristic algorithms based on the beam search technique. These algorithms include classic beam search procedures, as well as the filtered and recovering variants. Previous beam search implementations use fixed beam and filter widths. We consider the usual fixed width algorithms, and develop new versions that use variable beam and filter widths. Two new improvement procedures, based on adjacent pairwise interchanges and 3-swaps, are also presented. The computational results show that the beam search versions with a variable width are marginally superior to their fixed value counterparts, even when a lower average number of beam and filter nodes is used. The best results are given by the filtered beam search algorithms. For large problems, however, these procedures require excessive computation times. The priority beam search algorithms are much faster, and can therefore be used for the largest instances. The 3-swap method is the best of the improvement procedures, giving the largest relative improvement and decreasing the total cost for a larger number of instances.

Open-access reader

About this research paper

What this paper is about

In this paper, we consider the single machine weighted tardiness scheduling problem with sequence-dependent setups. We present heuristic algorithms based on the beam search technique. These algorithms include classic beam search procedures, as well as the filtered and recovering variants. Previous beam search implementations use fixed beam and filter widths. We consider the usual fixed width algorithms, and develop new versions that use variable beam and filter widths. Two new improvement procedures, based on adjacent pairwise interchanges and 3-swaps, are also presented. The computational results show that the beam search versions with a variable width are marginally superior to their fixed value counterparts, even when a lower average number of beam and filter nodes is used. The best results are given by the filtered beam search algorithms. For large problems, however, these procedures require excessive computation times. The priority beam search algorithms are much faster, and can therefore be used for the largest instances. The 3-swap method is the best of the improvement procedures, giving the largest relative improvement and decreasing the total cost for a larger number of instances.

Why it matters

OpenAlex reports 15 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In this paper, we consider the single machine weighted tardiness scheduling problem with sequence-dependent setups. We present heuristic algorithms based on the beam search technique. These algorithms include classic beam search procedures, as well as the filtered and recovering variants. Previous beam search implementations use fixed beam and filter widths. We consider the usual fixed width algorithms, and develop new versions that use variable beam and filter widths. Two new improvement procedures, based on adjacent pairwise interchanges and 3-swaps, are also presented. The computational results show that the beam search versions with a variable width are marginally superior to their fixed value counterparts, even when a lower average number of beam and filter nodes is used. The best results are given by the filtered beam search algorithms. For large problems, however, these procedures require excessive computation times. The priority beam search algorithms are much faster, and can therefore be used for the largest instances. The 3-swap method is the best of the improvement procedures, giving the largest relative improvement and decreasing the total cost for a larger number of instances.

Key concepts: Tardiness, Beam search, Algorithm, Search algorithm, Single-machine scheduling, Scheduling (production processes), Filter (signal processing), Computation

Related papers

Back to paper searchBrowse research topicsOriginal source
Beam search algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setups — Research Paper | ScholarLens