1945Unpublished venueRequires access

Burlington Streets: Howard St.

L. L. McAllister

Open publisher page 0 citations

Abstract

July 26, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly shows the excavation being made to receive the sand cushion and telford stone base. Note the condition of the old curb and gutter and sidewalk on the northerly side of the street, and the undertile drain being laid in the center of the street near the power shovel. Undertile drainage was also laid on both sides of the street back of the curb to provide proper drainage. The sub-base was soft blue clay and very unstable and full of moisture. It was necessary to stabilize this sub-base by mixing a layer of sand with the clay and treating with asphalt emulsion before the sand cushion and Telford Base could be placed as trucks could not pass over the base with a load of material without getting stuck.

About this research paper

What this paper is about

July 26, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly shows the excavation being made to receive the sand cushion and telford stone base. Note the condition of the old curb and gutter and sidewalk on the northerly side of the street, and the undertile drain being laid in the center of the street near the power shovel. Undertile drainage was also laid on both sides of the street back of the curb to provide proper drainage. The sub-base was soft blue clay and very unstable and full of moisture. It was necessary to stabilize this sub-base by mixing a layer of sand with the clay and treating with asphalt emulsion before the sand cushion and Telford Base could be placed as trucks could not pass over the base with a load of material without getting stuck.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

July 26, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly shows the excavation being made to receive the sand cushion and telford stone base. Note the condition of the old curb and gutter and sidewalk on the northerly side of the street, and the undertile drain being laid in the center of the street near the power shovel. Undertile drainage was also laid on both sides of the street back of the curb to provide proper drainage. The sub-base was soft blue clay and very unstable and full of moisture. It was necessary to stabilize this sub-base by mixing a layer of sand with the clay and treating with asphalt emulsion before the sand cushion and Telford Base could be placed as trucks could not pass over the base with a load of material without getting stuck.

Key concepts: Cushion, Geotechnical engineering, Base (topology), Geology, Shovel, Drainage, Mining engineering, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Burlington Streets: Howard St. — Research Paper | ScholarLens