ESTIMATION OF ANNUAL RUNOFF AND PEAK FLOW AT NAZANIN CATCHMENT IN ERBIL, KURDISTAN REGION USING DIFFERENT APPROACHES
Yaseen Aziz, Mariwan Akram Hamah Saeed, Shaheen Saber Ahmed
Abstract
Open-access reader
Yaseen Aziz, Mariwan Akram Hamah Saeed, Shaheen Saber Ahmed
Abstract
Open-access reader
Runoff is excess rainfall or a portion of rainfall that flows over the watershed. In un-gauged streams, due to lack of data, many methods are used for runoff estimation. In this paper annual runoff and peak flow of Nazanin watershed were estimated at Nazanin Dam location using different methods. Soil Conservation Service (SCS) method, basin relation, (Hydrologic Engineering Center – Hydrologic Modeling System) HEC-HMS and Hydrologic engineering center (HEC-1) models were provided. The Watershed Modeling System (WMS) package was used for watershed delineation and computation of curve number. The area of Nazanin catchment is 72.14 km2, and the composite curve number is 81.3. The results of average annual rainfall estimated using the basin relationship method are more than that obtained from SCS method. The results of peak flood discharge for different return periods using different approaches such as SCS method, HEC-HMS and HEC-1 models are very close. But the results of basin relation are lower than SCS method. From the results of comparison, it was observed that HEC-HMS and HEC-1 models can be used for generation flood hydrograph at ungagged watershed.
OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Runoff is excess rainfall or a portion of rainfall that flows over the watershed. In un-gauged streams, due to lack of data, many methods are used for runoff estimation. In this paper annual runoff and peak flow of Nazanin watershed were estimated at Nazanin Dam location using different methods. Soil Conservation Service (SCS) method, basin relation, (Hydrologic Engineering Center – Hydrologic Modeling System) HEC-HMS and Hydrologic engineering center (HEC-1) models were provided. The Watershed Modeling System (WMS) package was used for watershed delineation and computation of curve number. The area of Nazanin catchment is 72.14 km2, and the composite curve number is 81.3. The results of average annual rainfall estimated using the basin relationship method are more than that obtained from SCS method. The results of peak flood discharge for different return periods using different approaches such as SCS method, HEC-HMS and HEC-1 models are very close. But the results of basin relation are lower than SCS method. From the results of comparison, it was observed that HEC-HMS and HEC-1 models can be used for generation flood hydrograph at ungagged watershed.
Key concepts: Watershed, Hydrology (agriculture), Runoff curve number, Hydrograph, HEC-HMS, Surface runoff, Time of concentration, Environmental science