Upgrading HVAC Systems For Energy Efficiency—Verification of System Performance
Albert Thumann, Terry Niehus, William J. Younger
Abstract
Albert Thumann, Terry Niehus, William J. Younger
Abstract
Heating, ventilating, and air conditioning (HVAC) systems are among the most complex of all building service systems. To maintain a high level of occupant comfort, worker productivity, indoor air quality (IAQ) and energy efficiency, HVAC systems must be properly designed, installed, maintained and operated. Inherent in the design intent is that the system operates with energy efficiently and maintains acceptable IAQ in the building. The verification of performance tests for fans and pumps include pressure tests across the fan or pump, pressure tests in the air or water distribution system, and flow readings at the air or water terminal. Performance testing a chiller or cooling tower involves a heat balance. System commissioning is the process of assessing system performance to assure proper functioning and adherence to design criteria, including the actual start-up and testing of the HVAC system. It is generally assumed that the HVAC systems and lighting systems account for most of a building’s energy use.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Heating, ventilating, and air conditioning (HVAC) systems are among the most complex of all building service systems. To maintain a high level of occupant comfort, worker productivity, indoor air quality (IAQ) and energy efficiency, HVAC systems must be properly designed, installed, maintained and operated. Inherent in the design intent is that the system operates with energy efficiently and maintains acceptable IAQ in the building. The verification of performance tests for fans and pumps include pressure tests across the fan or pump, pressure tests in the air or water distribution system, and flow readings at the air or water terminal. Performance testing a chiller or cooling tower involves a heat balance. System commissioning is the process of assessing system performance to assure proper functioning and adherence to design criteria, including the actual start-up and testing of the HVAC system. It is generally assumed that the HVAC systems and lighting systems account for most of a building’s energy use.
Key concepts: HVAC, Efficient energy use, Computer science, Energy (signal processing), Automotive engineering, Environmental science, Architectural engineering, Engineering