Study and Characterization of SPIRAL2 BPMs
Victor Langlois, Thierry Andre, C. Jamet, G. Ledu, Patrick Legallois, Sebastien Leloir, Fabrice Lepoittevin, M. Lewitowicz, S. Loret, C. Potier de Courcy
Abstract
Victor Langlois, Thierry Andre, C. Jamet, G. Ledu, Patrick Legallois, Sebastien Leloir, Fabrice Lepoittevin, M. Lewitowicz, S. Loret, C. Potier de Courcy
Abstract
The SPIRAL2 facility currently under commissioning at GANIL in France will deliver high-intensity up to 20MeV/n and 5mA light and heavy ions beams. SPIRAL2 beams are accelerated by a Radio Frequency Quadrupole (RFQ) and a LINAC fitted with 20 supraconducting cavities. A tuning of the SPIRAL2 LINAC relies mainly on Pick-up Beam Profile Monitors (BPM). 20 BPM are mounted inside the warm sections between superconducting cavities. They serve to measure a beam transverse position to center the beam, a phase to tune cavities and an ellipticity to adjust beam optics along the LINAC. The phase and ellipticity measurements require high acquisition accuracy of the BPM signals. This paper deals with an analytical study and CST code simulations of the BPM performed in order to compute correction coefficients for the ellipticity measurements. The results of calculations were compared with experimental ones obtained with two BPMs located on a ¿diagnostic plate¿ after the RFQ . Finally, the BPM acquisition chain was carefully characterized to identify its uncertainties and to ensure that it meets initial specifications.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The SPIRAL2 facility currently under commissioning at GANIL in France will deliver high-intensity up to 20MeV/n and 5mA light and heavy ions beams. SPIRAL2 beams are accelerated by a Radio Frequency Quadrupole (RFQ) and a LINAC fitted with 20 supraconducting cavities. A tuning of the SPIRAL2 LINAC relies mainly on Pick-up Beam Profile Monitors (BPM). 20 BPM are mounted inside the warm sections between superconducting cavities. They serve to measure a beam transverse position to center the beam, a phase to tune cavities and an ellipticity to adjust beam optics along the LINAC. The phase and ellipticity measurements require high acquisition accuracy of the BPM signals. This paper deals with an analytical study and CST code simulations of the BPM performed in order to compute correction coefficients for the ellipticity measurements. The results of calculations were compared with experimental ones obtained with two BPMs located on a ¿diagnostic plate¿ after the RFQ . Finally, the BPM acquisition chain was carefully characterized to identify its uncertainties and to ensure that it meets initial specifications.
Key concepts: Linear particle accelerator, Beam (structure), Physics, Optics, Transverse plane, Quadrupole, Radio-frequency quadrupole, Phase (matter)