1976•Unpublished venueRequires access
Energy Conversion Alternatives Study (ECAS), Phase 2. Volume 1: Summary and combined gas-stream turbine plant with an integrated low-BTU gasifier
D. T. Beecher
Open publisher page 0 citations
Abstract
This record does not include an abstract. Use the full-text link above if available.