2020DigitalCommons - CalPoly (California State Polytechnic University)Open access

Feasibility of Cross Laminated Timber Panels in Construction: A Case Study of Carbon12

Erik John Graber

Open full text 3 citations

Abstract

Cross Laminated Timber (CLT) is an extremely strong engineered wood panel intended for roof, floor, or wall applications. Currently there is little research comparing CLT to steel and concrete, materials CLT hopes to replace This research uses a detailed literary analysis on CLT and case study on Carbon12, a recently constructed CLT structure in Portland, Oregon, to compare the cost and schedule requirements of CLT with a cast-in-place concrete slab. The case study consisted of a detailed analysis of Carbon12, interview with Scott Noble, senior project manager for Carbon12, and a detailed schedule and cost analysis. Results showed that for a concrete floor system used on Carbon12, material costs were far less than costs for a CLT floor system and labor costs were far greater than costs for a CLT floor system. For the schedule analysis, results showed that a concrete floor system would add an additional 10 weeks to the construction schedule of Carbon12. These results led to the conclusion that CLT is a feasible building material for dense, urban, mid-rise structures similar to Carbon12. The quick installation time, small crew, and environmental benefits of CLT outweigh the added costs of the material.

Open-access reader

About this research paper

What this paper is about

Cross Laminated Timber (CLT) is an extremely strong engineered wood panel intended for roof, floor, or wall applications. Currently there is little research comparing CLT to steel and concrete, materials CLT hopes to replace This research uses a detailed literary analysis on CLT and case study on Carbon12, a recently constructed CLT structure in Portland, Oregon, to compare the cost and schedule requirements of CLT with a cast-in-place concrete slab. The case study consisted of a detailed analysis of Carbon12, interview with Scott Noble, senior project manager for Carbon12, and a detailed schedule and cost analysis. Results showed that for a concrete floor system used on Carbon12, material costs were far less than costs for a CLT floor system and labor costs were far greater than costs for a CLT floor system. For the schedule analysis, results showed that a concrete floor system would add an additional 10 weeks to the construction schedule of Carbon12. These results led to the conclusion that CLT is a feasible building material for dense, urban, mid-rise structures similar to Carbon12. The quick installation time, small crew, and environmental benefits of CLT outweigh the added costs of the material.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Cross Laminated Timber (CLT) is an extremely strong engineered wood panel intended for roof, floor, or wall applications. Currently there is little research comparing CLT to steel and concrete, materials CLT hopes to replace This research uses a detailed literary analysis on CLT and case study on Carbon12, a recently constructed CLT structure in Portland, Oregon, to compare the cost and schedule requirements of CLT with a cast-in-place concrete slab. The case study consisted of a detailed analysis of Carbon12, interview with Scott Noble, senior project manager for Carbon12, and a detailed schedule and cost analysis. Results showed that for a concrete floor system used on Carbon12, material costs were far less than costs for a CLT floor system and labor costs were far greater than costs for a CLT floor system. For the schedule analysis, results showed that a concrete floor system would add an additional 10 weeks to the construction schedule of Carbon12. These results led to the conclusion that CLT is a feasible building material for dense, urban, mid-rise structures similar to Carbon12. The quick installation time, small crew, and environmental benefits of CLT outweigh the added costs of the material.

Key concepts: Cross laminated timber, Forensic engineering, Engineering, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Feasibility of Cross Laminated Timber Panels in Construction: A Case Study of Carbon12 — Research Paper | ScholarLens