In medium/long-term reservoir operation, the hydropower output is calculated from k × q × h, where q is the power discharge, h is the water head, and k is the comprehensive hydropower coefficient.k indicates the conversion efficiency from water power to electricity, however, it is standard practice to use a constant k.We developed a novel method to derive the varying k based on observed big data.The operational frequencies of different units for time (multiple periods) and space (multiple units) were accounted based on the observed big data from each unit, and then weights were obtained.Finally, k was derived by integrating the efficiency curves (hill charts) of the different units with their weights.The Three Gorges Project, China, was selected for a case study.Results indicated that: (1) the varying k value can improve hydropower simulation accuracy, (2) simulations using 10day intervals have a higher accuracy for hydropower calculation than daily and monthly scales, (3) the evaluation of hydropower plant benefits is sensitive to k, and there is potential for producing more hydropower.These findings are highly relevant to the operation of hydropower plants and to the evaluation of medium/long-term hydropower generation for a hydropower plant.

Open-access reader

About this research paper

What this paper is about

In medium/long-term reservoir operation, the hydropower output is calculated from k × q × h, where q is the power discharge, h is the water head, and k is the comprehensive hydropower coefficient.k indicates the conversion efficiency from water power to electricity, however, it is standard practice to use a constant k.We developed a novel method to derive the varying k based on observed big data.The operational frequencies of different units for time (multiple periods) and space (multiple units) were accounted based on the observed big data from each unit, and then weights were obtained.Finally, k was derived by integrating the efficiency curves (hill charts) of the different units with their weights.The Three Gorges Project, China, was selected for a case study.Results indicated that: (1) the varying k value can improve hydropower simulation accuracy, (2) simulations using 10day intervals have a higher accuracy for hydropower calculation than daily and monthly scales, (3) the evaluation of hydropower plant benefits is sensitive to k, and there is potential for producing more hydropower.These findings are highly relevant to the operation of hydropower plants and to the evaluation of medium/long-term hydropower generation for a hydropower plant.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In medium/long-term reservoir operation, the hydropower output is calculated from k × q × h, where q is the power discharge, h is the water head, and k is the comprehensive hydropower coefficient.k indicates the conversion efficiency from water power to electricity, however, it is standard practice to use a constant k.We developed a novel method to derive the varying k based on observed big data.The operational frequencies of different units for time (multiple periods) and space (multiple units) were accounted based on the observed big data from each unit, and then weights were obtained.Finally, k was derived by integrating the efficiency curves (hill charts) of the different units with their weights.The Three Gorges Project, China, was selected for a case study.Results indicated that: (1) the varying k value can improve hydropower simulation accuracy, (2) simulations using 10day intervals have a higher accuracy for hydropower calculation than daily and monthly scales, (3) the evaluation of hydropower plant benefits is sensitive to k, and there is potential for producing more hydropower.These findings are highly relevant to the operation of hydropower plants and to the evaluation of medium/long-term hydropower generation for a hydropower plant.

Key concepts: Hydropower, Three gorges, Environmental science, Term (time), Electricity generation, Power (physics), Hydrology (agriculture), Statistics

Related papers

Back to paper searchBrowse research topicsOriginal source
A varying comprehensive hydropower coefficient for medium/long-term operation of a single reservoir — Research Paper | ScholarLens