Implementation of Building Information Modeling for Construction Clash Detection Process in the Design Stage: A Case Study of Malaysian Police Headquarter Building

Emad Kasra Kermanshahi, Mahmood Md. Tahir, Nor Hasanah Abdul Shukor Lim, Ali Tighnavard Balasbaneh, Shervin Roshanghalb

Open full text 20 citations

Abstract

Abstract The Malaysian government motivates constructor companies to use Building Information Modeling (BIM) on their projects because it can dominate problems such as design error, delay, and construction-overrun costs. This research also assesses the effect of BIM in the design phase of the construction process and how this technology can detect all existing clash in construction plans during the design phase. The research was carried out through a case study that contains an architectural, structural, and Mechanical, Electrical and Plumbing (MEP) BIM models and their following clash detection. The current study implemented Autodesk Revit and Autodesk Navisworks Manage as BIM tools to develop features to simplify and automatically clash detection process. The result from the case study analysis revealed that BIM is an appropriate tool for detecting clashes among the building elements. Therefore, constructability issues can be determined earlier during the design phase before the construction phase begins, controlling project cost, time, and having a seamless design to produce a better building.

Open-access reader

About this research paper

What this paper is about

Abstract The Malaysian government motivates constructor companies to use Building Information Modeling (BIM) on their projects because it can dominate problems such as design error, delay, and construction-overrun costs. This research also assesses the effect of BIM in the design phase of the construction process and how this technology can detect all existing clash in construction plans during the design phase. The research was carried out through a case study that contains an architectural, structural, and Mechanical, Electrical and Plumbing (MEP) BIM models and their following clash detection. The current study implemented Autodesk Revit and Autodesk Navisworks Manage as BIM tools to develop features to simplify and automatically clash detection process. The result from the case study analysis revealed that BIM is an appropriate tool for detecting clashes among the building elements. Therefore, constructability issues can be determined earlier during the design phase before the construction phase begins, controlling project cost, time, and having a seamless design to produce a better building.

Why it matters

OpenAlex reports 20 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract The Malaysian government motivates constructor companies to use Building Information Modeling (BIM) on their projects because it can dominate problems such as design error, delay, and construction-overrun costs. This research also assesses the effect of BIM in the design phase of the construction process and how this technology can detect all existing clash in construction plans during the design phase. The research was carried out through a case study that contains an architectural, structural, and Mechanical, Electrical and Plumbing (MEP) BIM models and their following clash detection. The current study implemented Autodesk Revit and Autodesk Navisworks Manage as BIM tools to develop features to simplify and automatically clash detection process. The result from the case study analysis revealed that BIM is an appropriate tool for detecting clashes among the building elements. Therefore, constructability issues can be determined earlier during the design phase before the construction phase begins, controlling project cost, time, and having a seamless design to produce a better building.

Key concepts: Constructability, Building information modeling, Process (computing), Construction engineering, Phase (matter), Government (linguistics), Engineering design process, Building design

Related papers

Back to paper searchBrowse research topicsOriginal source
Implementation of Building Information Modeling for Construction Clash Detection Process in the Design Stage: A Case Study of Malaysian Police Headquarter Building — Research Paper | ScholarLens