Lunar landing and launch facilities and operations
nasa
Abstract
nasa
Abstract
A preliminary definition of a lunar landing and launch facility (LLLF or Complex 391) has been formulated. A Phase 3 lunar base is considered. Without specifying specific lunar base scenarios, three traffic levels are envisioned: 6, 12, and 24 landings/launches per year. A single, multipurpose vehicle for the lunar module is assumed. The design and specification of the vehicle and of the lunar base are outside the scope of this study. However, these two items will impact those items considered within the scope of this study because of interactions at the system boundaries. The scope of this study is graphically portrayed with the systems diagram. Based upon this diagram, nine major design items or areas are considered. These items are: (1) landing/launch site considerations; (2) structure, shelter, safety, and environmental needs; (3) landing/launch guidance, communications, and computing needs; (4) lunar module surface transport system; (5) heavy cargo unloading/loading systems; (6) personnel unloading/loading systems; (7) propellant unloading/loading systems; (8) vehicle storage; and (9) maintenance, repair, test and check-out requirements. Initially, a general, conceptual description of each of these items is given. Then, preliminary sizes, capacities, and other relevant design data for some of these items are identified. The Earth-Moon transportation infrastructure and the baseline lunar module design are summarized.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A preliminary definition of a lunar landing and launch facility (LLLF or Complex 391) has been formulated. A Phase 3 lunar base is considered. Without specifying specific lunar base scenarios, three traffic levels are envisioned: 6, 12, and 24 landings/launches per year. A single, multipurpose vehicle for the lunar module is assumed. The design and specification of the vehicle and of the lunar base are outside the scope of this study. However, these two items will impact those items considered within the scope of this study because of interactions at the system boundaries. The scope of this study is graphically portrayed with the systems diagram. Based upon this diagram, nine major design items or areas are considered. These items are: (1) landing/launch site considerations; (2) structure, shelter, safety, and environmental needs; (3) landing/launch guidance, communications, and computing needs; (4) lunar module surface transport system; (5) heavy cargo unloading/loading systems; (6) personnel unloading/loading systems; (7) propellant unloading/loading systems; (8) vehicle storage; and (9) maintenance, repair, test and check-out requirements. Initially, a general, conceptual description of each of these items is given. Then, preliminary sizes, capacities, and other relevant design data for some of these items are identified. The Earth-Moon transportation infrastructure and the baseline lunar module design are summarized.
Key concepts: Scope (computer science), Launch vehicle, Baseline (sea), Moon landing, Propellant, Systems engineering, Aeronautics, Base (topology)