Earth pressure balanced tunnelling in a dense urban environment, C917A

Gareth M. Jones, J. Shepherd

Open publisher page 0 citations

Abstract

The Singapore Land Transport Authority (LTA) has been procuring the expansion of their underground mass rapid transit rail network at a prodigious rate since the first line opened in 1987. Four lines (149 km) are currently operating and several more lines are at various stages of planning/construction; one of these is the Downtown line stage 2 (DTL 2). DTL 2 contract C917 was awarded in September 2009 for S$320 M. On 18 June 2013 the original contractor became insolvent, leaving the works incomplete. Following a fast-tracked tender process, McConnell Dowell was awarded the S$254 M contract on 29 August 2013 to complete the works. This contract includes two underground stations constructed by cut-and-cover methods and twin bored tunnels between the stations. Each tunnel is 1400 m long, excavated by earth pressure balanced (EPB) tunnel boring machines (TBM) at an average depth of 20 m and segment lined to 5.8 m inner diameter. The tunnel alignment is located under a busy five-lane road lined with prime residential real estate and congested with utilities. To compound the difficulty the tunnels are located within the notorious Bukit Timah Granite formation. This has a very wide range of strength, from below 1 MPa to over 300 MPa. This strength range is a consequence of six weathering grades, from soil to fresh rock, with the fresh granite causing severe abrasion problems. The various grades can occur within a very short distance of each other. Consequently, the problem of supporting a mixed face exists, particularly in the intermediate weathering grades where intact rock is encountered in the invert and corestones within a loose soil matrix in the crown, which can increase the instability by allowing the ground to flow into the TBM. The focus of this paper will be the excavation of the bored tunnels by EPB TBM used by McConnell Dowell to complete these challenging works.

About this research paper

What this paper is about

The Singapore Land Transport Authority (LTA) has been procuring the expansion of their underground mass rapid transit rail network at a prodigious rate since the first line opened in 1987. Four lines (149 km) are currently operating and several more lines are at various stages of planning/construction; one of these is the Downtown line stage 2 (DTL 2). DTL 2 contract C917 was awarded in September 2009 for S$320 M. On 18 June 2013 the original contractor became insolvent, leaving the works incomplete. Following a fast-tracked tender process, McConnell Dowell was awarded the S$254 M contract on 29 August 2013 to complete the works. This contract includes two underground stations constructed by cut-and-cover methods and twin bored tunnels between the stations. Each tunnel is 1400 m long, excavated by earth pressure balanced (EPB) tunnel boring machines (TBM) at an average depth of 20 m and segment lined to 5.8 m inner diameter. The tunnel alignment is located under a busy five-lane road lined with prime residential real estate and congested with utilities. To compound the difficulty the tunnels are located within the notorious Bukit Timah Granite formation. This has a very wide range of strength, from below 1 MPa to over 300 MPa. This strength range is a consequence of six weathering grades, from soil to fresh rock, with the fresh granite causing severe abrasion problems. The various grades can occur within a very short distance of each other. Consequently, the problem of supporting a mixed face exists, particularly in the intermediate weathering grades where intact rock is encountered in the invert and corestones within a loose soil matrix in the crown, which can increase the instability by allowing the ground to flow into the TBM. The focus of this paper will be the excavation of the bored tunnels by EPB TBM used by McConnell Dowell to complete these challenging works.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Singapore Land Transport Authority (LTA) has been procuring the expansion of their underground mass rapid transit rail network at a prodigious rate since the first line opened in 1987. Four lines (149 km) are currently operating and several more lines are at various stages of planning/construction; one of these is the Downtown line stage 2 (DTL 2). DTL 2 contract C917 was awarded in September 2009 for S$320 M. On 18 June 2013 the original contractor became insolvent, leaving the works incomplete. Following a fast-tracked tender process, McConnell Dowell was awarded the S$254 M contract on 29 August 2013 to complete the works. This contract includes two underground stations constructed by cut-and-cover methods and twin bored tunnels between the stations. Each tunnel is 1400 m long, excavated by earth pressure balanced (EPB) tunnel boring machines (TBM) at an average depth of 20 m and segment lined to 5.8 m inner diameter. The tunnel alignment is located under a busy five-lane road lined with prime residential real estate and congested with utilities. To compound the difficulty the tunnels are located within the notorious Bukit Timah Granite formation. This has a very wide range of strength, from below 1 MPa to over 300 MPa. This strength range is a consequence of six weathering grades, from soil to fresh rock, with the fresh granite causing severe abrasion problems. The various grades can occur within a very short distance of each other. Consequently, the problem of supporting a mixed face exists, particularly in the intermediate weathering grades where intact rock is encountered in the invert and corestones within a loose soil matrix in the crown, which can increase the instability by allowing the ground to flow into the TBM. The focus of this paper will be the excavation of the bored tunnels by EPB TBM used by McConnell Dowell to complete these challenging works.

Key concepts: Mining engineering, Geology, Downtown, Geotechnical engineering, Engineering, Archaeology, Geography