2013•Zhonghua xiandai huli zazhiRequires access

Effect study on plan-do-check-action cyclic management and prevention of children chemotherapeutic drugs extravasation

Fang Chen, Zhi Jian Lin, Hua Du, Ning Xiao

Open publisher page 0 citations

Abstract

Objective To analyze the effect of PDCA cycle management method on reducing the rate of extravasation of chemotherapeutic drugs in children.Methods PDCA cycle management mode was adopted in 71 children in chemotherapy period in the blood cancer ward from October 2009 to May 2011,and 68 children in non-chemotherapy period during the same hospitalized period were control group.Analyzed the extravasation rate and evaluate the effect of PDCA cycle management on chemotherapy extravasation.Results There were 2 cases of extravasation in chemotherapy group,with the extravasation rate of 2.82%,while there was 6 cases of extravasation in control group and the rate was 8.82%,and the difference was statistically significant (X2 =5.887,P < 0.05).Conclusions PDCA cycle management can effectively reduce the rate of extravasation of chemotherapeutic drugs in children. Key words: Children;  Plan-do-check-action cycle management;  Chemotherapeutic drugs extravasation

About this research paper

What this paper is about

Objective To analyze the effect of PDCA cycle management method on reducing the rate of extravasation of chemotherapeutic drugs in children.Methods PDCA cycle management mode was adopted in 71 children in chemotherapy period in the blood cancer ward from October 2009 to May 2011,and 68 children in non-chemotherapy period during the same hospitalized period were control group.Analyzed the extravasation rate and evaluate the effect of PDCA cycle management on chemotherapy extravasation.Results There were 2 cases of extravasation in chemotherapy group,with the extravasation rate of 2.82%,while there was 6 cases of extravasation in control group and the rate was 8.82%,and the difference was statistically significant (X2 =5.887,P < 0.05).Conclusions PDCA cycle management can effectively reduce the rate of extravasation of chemotherapeutic drugs in children. Key words: Children;  Plan-do-check-action cycle management;  Chemotherapeutic drugs extravasation

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Objective To analyze the effect of PDCA cycle management method on reducing the rate of extravasation of chemotherapeutic drugs in children.Methods PDCA cycle management mode was adopted in 71 children in chemotherapy period in the blood cancer ward from October 2009 to May 2011,and 68 children in non-chemotherapy period during the same hospitalized period were control group.Analyzed the extravasation rate and evaluate the effect of PDCA cycle management on chemotherapy extravasation.Results There were 2 cases of extravasation in chemotherapy group,with the extravasation rate of 2.82%,while there was 6 cases of extravasation in control group and the rate was 8.82%,and the difference was statistically significant (X2 =5.887,P < 0.05).Conclusions PDCA cycle management can effectively reduce the rate of extravasation of chemotherapeutic drugs in children. Key words: Children;  Plan-do-check-action cycle management;  Chemotherapeutic drugs extravasation

Key concepts: Extravasation, PDCA, Medicine, Chemotherapy, Chemotherapeutic drugs, Anesthesia, Surgery, Pathology

Related papers

Back to paper searchBrowse research topicsOriginal source
Effect study on plan-do-check-action cyclic management and prevention of children chemotherapeutic drugs extravasation — Research Paper | ScholarLens