2019•International Journal of Advances in Scientific Research and EngineeringOpen access

Simulation of Turbine-Generator

Magy Kandil, Azza.A .Hassan, Fatma A. Gaber

Open full text 1 citations

Abstract

This study involved mathematical modeling of turbine generator simulator (TGS) and speed governing system for Fast Breeder Reactor (FBR). All steam turbine system utilize governor controlled valves at the inlet to the turbine to control the steam flow. The previously developed FBR and Pressurized water reactors (PWR) mathematical models (by author) [1] were connected to the same Turbine-generator model and controlled by the same method of control. Then a comparison between the dynamic performance transient response of FBR and PWR controlled plants were considered in two cases, load demand perturbation and reactivity perturbations. The steam chest and inlet piping to the turbine cylinder introduce delays between valve movement and change in the steam flow. The results show that the model is capable of simulating the dynamic transient response for FBR in two cases, load demand perturbation and reactivity perturbations.

Open-access reader

About this research paper

What this paper is about

This study involved mathematical modeling of turbine generator simulator (TGS) and speed governing system for Fast Breeder Reactor (FBR). All steam turbine system utilize governor controlled valves at the inlet to the turbine to control the steam flow. The previously developed FBR and Pressurized water reactors (PWR) mathematical models (by author) [1] were connected to the same Turbine-generator model and controlled by the same method of control. Then a comparison between the dynamic performance transient response of FBR and PWR controlled plants were considered in two cases, load demand perturbation and reactivity perturbations. The steam chest and inlet piping to the turbine cylinder introduce delays between valve movement and change in the steam flow. The results show that the model is capable of simulating the dynamic transient response for FBR in two cases, load demand perturbation and reactivity perturbations.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This study involved mathematical modeling of turbine generator simulator (TGS) and speed governing system for Fast Breeder Reactor (FBR). All steam turbine system utilize governor controlled valves at the inlet to the turbine to control the steam flow. The previously developed FBR and Pressurized water reactors (PWR) mathematical models (by author) [1] were connected to the same Turbine-generator model and controlled by the same method of control. Then a comparison between the dynamic performance transient response of FBR and PWR controlled plants were considered in two cases, load demand perturbation and reactivity perturbations. The steam chest and inlet piping to the turbine cylinder introduce delays between valve movement and change in the steam flow. The results show that the model is capable of simulating the dynamic transient response for FBR in two cases, load demand perturbation and reactivity perturbations.

Key concepts: Piping, Boiler (water heating), Turbine, Steam turbine, Transient (computer programming), Control valves, Control theory (sociology), Transient response

Related papers

Back to paper searchBrowse research topicsOriginal source
Simulation of Turbine-Generator — Research Paper | ScholarLens