2020•Journal of Building PerformanceRequires access

Application of Theory of Constraints in quantity surveying firm

Norhanim Binti Zakaria, Azlan Shah Ali, Teh Yen Yi

Open publisher page 2 citations

Abstract

As the construction projects grow in size and complexity, the roles of Quantity Surveying (QS) firms which provide QS services getting more significant. Theory of Constraints (TOC) views every process in a system are linked and bottleneck constraint needs to be identified and dealt with so that to achieve continuous improvement in the whole operation. So far, no research conducted on bottleneck constraints in QS firms working environment as well as the application of TOC to the constraints. Removing constraints are the most effective way to improve the overall system performance. As QS firm does not involve inventory, the TOC application and its impacts might be different. This research focused on how TOC approach could be applied in solving the bottleneck constraint appeared in the QS firm. This study adopted questionnaire surveys and semi-structured interviews with QS practitioners, which directly involved in the management of the QS firm. Descriptive and content analysis are adopted to analyse the identified bottleneck constraint, TOC methodology used to deal with the constraint, as well as the impacts of TOC to the QS firms. The discussion outcome further explains the TOC methodology used to deal with the constraint appeared and the impacts of applying it. In overall, the most common bottleneck constraint in the QS firms is the delay of other project participants. TOC can be applied in QS firm working environment and it brings positive impacts as it aids in the decision-making in QS firms.

About this research paper

What this paper is about

As the construction projects grow in size and complexity, the roles of Quantity Surveying (QS) firms which provide QS services getting more significant. Theory of Constraints (TOC) views every process in a system are linked and bottleneck constraint needs to be identified and dealt with so that to achieve continuous improvement in the whole operation. So far, no research conducted on bottleneck constraints in QS firms working environment as well as the application of TOC to the constraints. Removing constraints are the most effective way to improve the overall system performance. As QS firm does not involve inventory, the TOC application and its impacts might be different. This research focused on how TOC approach could be applied in solving the bottleneck constraint appeared in the QS firm. This study adopted questionnaire surveys and semi-structured interviews with QS practitioners, which directly involved in the management of the QS firm. Descriptive and content analysis are adopted to analyse the identified bottleneck constraint, TOC methodology used to deal with the constraint, as well as the impacts of TOC to the QS firms. The discussion outcome further explains the TOC methodology used to deal with the constraint appeared and the impacts of applying it. In overall, the most common bottleneck constraint in the QS firms is the delay of other project participants. TOC can be applied in QS firm working environment and it brings positive impacts as it aids in the decision-making in QS firms.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

As the construction projects grow in size and complexity, the roles of Quantity Surveying (QS) firms which provide QS services getting more significant. Theory of Constraints (TOC) views every process in a system are linked and bottleneck constraint needs to be identified and dealt with so that to achieve continuous improvement in the whole operation. So far, no research conducted on bottleneck constraints in QS firms working environment as well as the application of TOC to the constraints. Removing constraints are the most effective way to improve the overall system performance. As QS firm does not involve inventory, the TOC application and its impacts might be different. This research focused on how TOC approach could be applied in solving the bottleneck constraint appeared in the QS firm. This study adopted questionnaire surveys and semi-structured interviews with QS practitioners, which directly involved in the management of the QS firm. Descriptive and content analysis are adopted to analyse the identified bottleneck constraint, TOC methodology used to deal with the constraint, as well as the impacts of TOC to the QS firms. The discussion outcome further explains the TOC methodology used to deal with the constraint appeared and the impacts of applying it. In overall, the most common bottleneck constraint in the QS firms is the delay of other project participants. TOC can be applied in QS firm working environment and it brings positive impacts as it aids in the decision-making in QS firms.

Key concepts: Bottleneck, Theory of constraints, Constraint (computer-aided design), Sample (material), Operations research, Process (computing), Business, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Application of Theory of Constraints in quantity surveying firm — Research Paper | ScholarLens