2020Unpublished venueRequires access

Where are we? the level of risk management in Malaysian construction industries

Mohd Nasrun Mohd Nawi, A. Q. Adeleke, Saipol Bari Abd-Karim

Open publisher page 10 citations

Abstract

Over the decade, the level of risk management has always been lingering in every construction industry sectors. Therefore, this research deeply investigated the level of risk management among Kuantan Malaysian construction industries to better promote effectiveness on risk management implementation within the industry. To address this issues, this study makes use of statistical package for the social sciences (SPSS) approach to validate construction risk management (CRM) as a construct from registered Grade-7 contractors operating in Malaysia point of view. With a cross-sectional survey and proportionate stratified random sampling techniques, data were gathered from 87 G-7 contractors through a structured questionnaire. Methodologically, this research perhaps might be the first to determine the level of risk management where Kuantan Malaysian construction industries belong to. Using the five-point Likert scale categories (very low, low, medium, high and very high) of risk management from previous studies, statistical analysis affirmed that the overall level of risk management among Kuantan Malaysian construction industries is at the high level.

About this research paper

What this paper is about

Over the decade, the level of risk management has always been lingering in every construction industry sectors. Therefore, this research deeply investigated the level of risk management among Kuantan Malaysian construction industries to better promote effectiveness on risk management implementation within the industry. To address this issues, this study makes use of statistical package for the social sciences (SPSS) approach to validate construction risk management (CRM) as a construct from registered Grade-7 contractors operating in Malaysia point of view. With a cross-sectional survey and proportionate stratified random sampling techniques, data were gathered from 87 G-7 contractors through a structured questionnaire. Methodologically, this research perhaps might be the first to determine the level of risk management where Kuantan Malaysian construction industries belong to. Using the five-point Likert scale categories (very low, low, medium, high and very high) of risk management from previous studies, statistical analysis affirmed that the overall level of risk management among Kuantan Malaysian construction industries is at the high level.

Why it matters

OpenAlex reports 10 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Over the decade, the level of risk management has always been lingering in every construction industry sectors. Therefore, this research deeply investigated the level of risk management among Kuantan Malaysian construction industries to better promote effectiveness on risk management implementation within the industry. To address this issues, this study makes use of statistical package for the social sciences (SPSS) approach to validate construction risk management (CRM) as a construct from registered Grade-7 contractors operating in Malaysia point of view. With a cross-sectional survey and proportionate stratified random sampling techniques, data were gathered from 87 G-7 contractors through a structured questionnaire. Methodologically, this research perhaps might be the first to determine the level of risk management where Kuantan Malaysian construction industries belong to. Using the five-point Likert scale categories (very low, low, medium, high and very high) of risk management from previous studies, statistical analysis affirmed that the overall level of risk management among Kuantan Malaysian construction industries is at the high level.

Key concepts: Likert scale, Stratified sampling, Risk management, Business, Scale (ratio), Operations management, Construction industry, Point (geometry)

Related papers

Back to paper searchBrowse research topicsOriginal source
Where are we? the level of risk management in Malaysian construction industries — Research Paper | ScholarLens