2020•SPE/ICoTA Well Intervention Conference and ExhibitionRequires access

Coiled Tubing Adaptability in the Development of Shale Plays: 81 Days of Continuous Operation in the First UK Land Gas Shale Project

Diego A. Fernandez C, Ernesto Franco D., Carlos Villagrana P., Ángel Machado

Open publisher page 0 citations

Abstract

Abstract This paper presents the procedures, best practices and results of a coiled tubing project on the first unconventional completion using the multistage fracturing technique onshore in the United Kingdom, to achieve commercial gas flow rates from the inland shale formations. The main goal of the coiled tubing operations was to deliver multiple hydraulic fracturing stages through the CT/tubing annulus in a single run; but the versatile technology was used for a wide range of intervention activities during the project.

About this research paper

What this paper is about

Abstract This paper presents the procedures, best practices and results of a coiled tubing project on the first unconventional completion using the multistage fracturing technique onshore in the United Kingdom, to achieve commercial gas flow rates from the inland shale formations. The main goal of the coiled tubing operations was to deliver multiple hydraulic fracturing stages through the CT/tubing annulus in a single run; but the versatile technology was used for a wide range of intervention activities during the project.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract This paper presents the procedures, best practices and results of a coiled tubing project on the first unconventional completion using the multistage fracturing technique onshore in the United Kingdom, to achieve commercial gas flow rates from the inland shale formations. The main goal of the coiled tubing operations was to deliver multiple hydraulic fracturing stages through the CT/tubing annulus in a single run; but the versatile technology was used for a wide range of intervention activities during the project.

Key concepts: Shale gas, Coiled tubing, Petroleum engineering, Annulus (botany), Hydraulic fracturing, Oil shale, Adaptability, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Coiled Tubing Adaptability in the Development of Shale Plays: 81 Days of Continuous Operation in the First UK Land Gas Shale Project — Research Paper | ScholarLens