Coiled Tubing Adaptability in the Development of Shale Plays: 81 Days of Continuous Operation in the First UK Land Gas Shale Project
Diego A. Fernandez C, Ernesto Franco D., Carlos Villagrana P., Ángel Machado
Abstract
Diego A. Fernandez C, Ernesto Franco D., Carlos Villagrana P., Ángel Machado
Abstract
Abstract This paper presents the procedures, best practices and results of a coiled tubing project on the first unconventional completion using the multistage fracturing technique onshore in the United Kingdom, to achieve commercial gas flow rates from the inland shale formations. The main goal of the coiled tubing operations was to deliver multiple hydraulic fracturing stages through the CT/tubing annulus in a single run; but the versatile technology was used for a wide range of intervention activities during the project.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Abstract This paper presents the procedures, best practices and results of a coiled tubing project on the first unconventional completion using the multistage fracturing technique onshore in the United Kingdom, to achieve commercial gas flow rates from the inland shale formations. The main goal of the coiled tubing operations was to deliver multiple hydraulic fracturing stages through the CT/tubing annulus in a single run; but the versatile technology was used for a wide range of intervention activities during the project.
Key concepts: Shale gas, Coiled tubing, Petroleum engineering, Annulus (botany), Hydraulic fracturing, Oil shale, Adaptability, Geology