2020International Journal of Energy Economics and PolicyOpen access

DECISION SUPPORT SYSTEM FOR HYDRO POWER PLANTS IN AMAZON CONSIDERING THE COST OF EXTERNALITIES

Evelyn Gabbay Alves Carvalho, Cláudio José Cavalcante Blanco, André Augusto Azevedo Montenegro Duarte, Luiz Maurício Furtado Maués

Open full text 3 citations

Abstract

Feasibility studies on Hydro Power Plants (HPPs) should adequately measure the values of the social, economic and environmental impacts (i.e., its externalities) of HPPs. In this case, the final cost of an energy generation project is lower than the actual value because the impacts are not appropriately assessed. Thus, the objective of this paper is to estimate the total cost of generated energy using a methodology capable of accounting for the cost of the externalities of hydroelectric plants. This study assesses the externality resulting from loss of fishing activity, an economic activity practised by a large part of a population affected by hydroelectric dam construction. To assess this externality, the opportunity cost method and a time series analysis are used to forecast future values. It is demonstrated that when considering only the externality resulting from the loss of fishing activity, the expected cost of energy production could increase significantly. This result indicates the need to calculate all the externalities caused by the implementation of a hydroelectric power plant (HPP) and to incorporate these actual values into the energy production cost, so the enterprise is sustainable and feasible. Our results also facilitate a realistic comparison with other sources of energy generation. Keywords: fishing activity; opportunity cost; forecast; Amazon. JEL Classifications : Q2, Q4. DOI: https://doi.org/10.32479/ijeep.8746

Open-access reader

About this research paper

What this paper is about

Feasibility studies on Hydro Power Plants (HPPs) should adequately measure the values of the social, economic and environmental impacts (i.e., its externalities) of HPPs. In this case, the final cost of an energy generation project is lower than the actual value because the impacts are not appropriately assessed. Thus, the objective of this paper is to estimate the total cost of generated energy using a methodology capable of accounting for the cost of the externalities of hydroelectric plants. This study assesses the externality resulting from loss of fishing activity, an economic activity practised by a large part of a population affected by hydroelectric dam construction. To assess this externality, the opportunity cost method and a time series analysis are used to forecast future values. It is demonstrated that when considering only the externality resulting from the loss of fishing activity, the expected cost of energy production could increase significantly. This result indicates the need to calculate all the externalities caused by the implementation of a hydroelectric power plant (HPP) and to incorporate these actual values into the energy production cost, so the enterprise is sustainable and feasible. Our results also facilitate a realistic comparison with other sources of energy generation. Keywords: fishing activity; opportunity cost; forecast; Amazon. JEL Classifications : Q2, Q4. DOI: https://doi.org/10.32479/ijeep.8746

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Feasibility studies on Hydro Power Plants (HPPs) should adequately measure the values of the social, economic and environmental impacts (i.e., its externalities) of HPPs. In this case, the final cost of an energy generation project is lower than the actual value because the impacts are not appropriately assessed. Thus, the objective of this paper is to estimate the total cost of generated energy using a methodology capable of accounting for the cost of the externalities of hydroelectric plants. This study assesses the externality resulting from loss of fishing activity, an economic activity practised by a large part of a population affected by hydroelectric dam construction. To assess this externality, the opportunity cost method and a time series analysis are used to forecast future values. It is demonstrated that when considering only the externality resulting from the loss of fishing activity, the expected cost of energy production could increase significantly. This result indicates the need to calculate all the externalities caused by the implementation of a hydroelectric power plant (HPP) and to incorporate these actual values into the energy production cost, so the enterprise is sustainable and feasible. Our results also facilitate a realistic comparison with other sources of energy generation. Keywords: fishing activity; opportunity cost; forecast; Amazon. JEL Classifications : Q2, Q4. DOI: https://doi.org/10.32479/ijeep.8746

Key concepts: Externality, Hydroelectricity, Environmental economics, Production (economics), Natural resource economics, Electricity generation, Fishing, Economics