The cost of a future low-carbon electricity system without nuclear power – the case of Sweden
Xiaoming Kan, Fredrik Hedenus, Lina Reichenberg
Abstract
Xiaoming Kan, Fredrik Hedenus, Lina Reichenberg
Abstract
To achieve the goal of deep decarbonization of the electricity system, more and more variable renewable energy (VRE) is being adopted. However, there is no consensus among researchers on whether the goal can be accomplished without large cost escalation if nuclear power is excluded in the future electricity system. In Sweden, where nuclear power generated 41% of the annual electricity supply in 2014, the official goal is 100% renewable electricity production by 2040. Therefore, we investigate the cost of a future low-carbon electricity system without nuclear power for Sweden. We model the European electricity system with a focus on Sweden and run a techno-economic cost optimization model for capacity investment and dispatch of generation, transmission, storage and demand-response, under a CO2 emission constraint of 10 g/kWh. Our results show that there are no, or only minor, cost benefits to reinvest in nuclear power plants in Sweden once the old ones are decommissioned. This holds for a large range of assumptions on technology costs and possibilities for investment in additional transmission capacity. We contrast our results with the recent study that claims severe cost penalties for not allowing nuclear power in Sweden and discuss the implications of methodology choice.
OpenAlex reports 77 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
To achieve the goal of deep decarbonization of the electricity system, more and more variable renewable energy (VRE) is being adopted. However, there is no consensus among researchers on whether the goal can be accomplished without large cost escalation if nuclear power is excluded in the future electricity system. In Sweden, where nuclear power generated 41% of the annual electricity supply in 2014, the official goal is 100% renewable electricity production by 2040. Therefore, we investigate the cost of a future low-carbon electricity system without nuclear power for Sweden. We model the European electricity system with a focus on Sweden and run a techno-economic cost optimization model for capacity investment and dispatch of generation, transmission, storage and demand-response, under a CO2 emission constraint of 10 g/kWh. Our results show that there are no, or only minor, cost benefits to reinvest in nuclear power plants in Sweden once the old ones are decommissioned. This holds for a large range of assumptions on technology costs and possibilities for investment in additional transmission capacity. We contrast our results with the recent study that claims severe cost penalties for not allowing nuclear power in Sweden and discuss the implications of methodology choice.
Key concepts: Nuclear power, Electricity, Environmental economics, Renewable energy, Electricity generation, Investment (military), Variable renewable energy, Stand-alone power system