2020EnergyOpen access

The cost of a future low-carbon electricity system without nuclear power – the case of Sweden

Xiaoming Kan, Fredrik Hedenus, Lina Reichenberg

Open full text 77 citations

Abstract

To achieve the goal of deep decarbonization of the electricity system, more and more variable renewable energy (VRE) is being adopted. However, there is no consensus among researchers on whether the goal can be accomplished without large cost escalation if nuclear power is excluded in the future electricity system. In Sweden, where nuclear power generated 41% of the annual electricity supply in 2014, the official goal is 100% renewable electricity production by 2040. Therefore, we investigate the cost of a future low-carbon electricity system without nuclear power for Sweden. We model the European electricity system with a focus on Sweden and run a techno-economic cost optimization model for capacity investment and dispatch of generation, transmission, storage and demand-response, under a CO2 emission constraint of 10 g/kWh. Our results show that there are no, or only minor, cost benefits to reinvest in nuclear power plants in Sweden once the old ones are decommissioned. This holds for a large range of assumptions on technology costs and possibilities for investment in additional transmission capacity. We contrast our results with the recent study that claims severe cost penalties for not allowing nuclear power in Sweden and discuss the implications of methodology choice.

About this research paper

What this paper is about

To achieve the goal of deep decarbonization of the electricity system, more and more variable renewable energy (VRE) is being adopted. However, there is no consensus among researchers on whether the goal can be accomplished without large cost escalation if nuclear power is excluded in the future electricity system. In Sweden, where nuclear power generated 41% of the annual electricity supply in 2014, the official goal is 100% renewable electricity production by 2040. Therefore, we investigate the cost of a future low-carbon electricity system without nuclear power for Sweden. We model the European electricity system with a focus on Sweden and run a techno-economic cost optimization model for capacity investment and dispatch of generation, transmission, storage and demand-response, under a CO2 emission constraint of 10 g/kWh. Our results show that there are no, or only minor, cost benefits to reinvest in nuclear power plants in Sweden once the old ones are decommissioned. This holds for a large range of assumptions on technology costs and possibilities for investment in additional transmission capacity. We contrast our results with the recent study that claims severe cost penalties for not allowing nuclear power in Sweden and discuss the implications of methodology choice.

Why it matters

OpenAlex reports 77 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To achieve the goal of deep decarbonization of the electricity system, more and more variable renewable energy (VRE) is being adopted. However, there is no consensus among researchers on whether the goal can be accomplished without large cost escalation if nuclear power is excluded in the future electricity system. In Sweden, where nuclear power generated 41% of the annual electricity supply in 2014, the official goal is 100% renewable electricity production by 2040. Therefore, we investigate the cost of a future low-carbon electricity system without nuclear power for Sweden. We model the European electricity system with a focus on Sweden and run a techno-economic cost optimization model for capacity investment and dispatch of generation, transmission, storage and demand-response, under a CO2 emission constraint of 10 g/kWh. Our results show that there are no, or only minor, cost benefits to reinvest in nuclear power plants in Sweden once the old ones are decommissioned. This holds for a large range of assumptions on technology costs and possibilities for investment in additional transmission capacity. We contrast our results with the recent study that claims severe cost penalties for not allowing nuclear power in Sweden and discuss the implications of methodology choice.

Key concepts: Nuclear power, Electricity, Environmental economics, Renewable energy, Electricity generation, Investment (military), Variable renewable energy, Stand-alone power system

Related papers

Back to paper searchBrowse research topicsOriginal source
The cost of a future low-carbon electricity system without nuclear power – the case of Sweden — Research Paper | ScholarLens