A 1.3 GeV synchrotron radiation storage ring is currently under construction at SRRC. The installation activities had gone through about one year, from March 1992 to March 1993. The commissioning of the booster to storage ring (BTS) transfer line started from August 1992 soon after a 1.3 GeV synchrotron booster injector had been delivered in July 1992. The intensive activities of the storage ring beam tests began in April 1993. We had stored beam in April and some machine parameters have been measured. >
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A 1.3 GeV synchrotron radiation storage ring is currently under construction at SRRC. The installation activities had gone through about one year, from March 1992 to March 1993. The commissioning of the booster to storage ring (BTS) transfer line started from August 1992 soon after a 1.3 GeV synchrotron booster injector had been delivered in July 1992. The intensive activities of the storage ring beam tests began in April 1993. We had stored beam in April and some machine parameters have been measured. >