Construction and Commissioning of the SRRC Storage Ring

Ying-Hung Liu, J. R. Chen, C.C. Kuo

Open publisher page 0 citations

Abstract

A 1.3 GeV synchrotron radiation storage ring is currently under construction at SRRC. The installation activities had gone through about one year, from March 1992 to March 1993. The commissioning of the booster to storage ring (BTS) transfer line started from August 1992 soon after a 1.3 GeV synchrotron booster injector had been delivered in July 1992. The intensive activities of the storage ring beam tests began in April 1993. We had stored beam in April and some machine parameters have been measured. >

About this research paper

What this paper is about

A 1.3 GeV synchrotron radiation storage ring is currently under construction at SRRC. The installation activities had gone through about one year, from March 1992 to March 1993. The commissioning of the booster to storage ring (BTS) transfer line started from August 1992 soon after a 1.3 GeV synchrotron booster injector had been delivered in July 1992. The intensive activities of the storage ring beam tests began in April 1993. We had stored beam in April and some machine parameters have been measured. >

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A 1.3 GeV synchrotron radiation storage ring is currently under construction at SRRC. The installation activities had gone through about one year, from March 1992 to March 1993. The commissioning of the booster to storage ring (BTS) transfer line started from August 1992 soon after a 1.3 GeV synchrotron booster injector had been delivered in July 1992. The intensive activities of the storage ring beam tests began in April 1993. We had stored beam in April and some machine parameters have been measured. >

Key concepts: Storage ring, Booster (rocketry), Synchrotron radiation, Project commissioning, Beamline, Synchrotron, Injector, Engineering