2020WaterOpen access

Flash Flood Early Warning Coupled with Hydrological Simulation and the Rising Rate of the Flood Stage in a Mountainous Small Watershed in Sichuan Province, China

Huawei Tu, Xiekang Wang, Wanshun Zhang, Hong Peng, Qian Ke, Xiaomin Chen

Open full text 29 citations

Abstract

Flash floods in mountainous areas have become more severe and frequent as a result of climate change and are a threat to public safety and social development. This study explores the application of distributed hydrological models in flash floods risk management in a small watershed in Sichuan Province, China, and aims to increase early warning lead time in mountainous areas. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC-HMS) model was used to simulate the flash flood process and analyze the variation in flood hydrographs. First, the HEC-HMS model was established based on geospatial data and the river network shape, and eight heavy rainfall events from 2010 to 2015 were used for model calibration and validation, showing that the HEC-HMS model was effective for the simulation of mountain floods in the study area. Second, with the assumption that rainfall and flood events have the same frequency, the flood hydrographs with different frequencies (p = 1%, 2%, 5%, and 10%) were calculated by the HEC-HMS model. The rising limbs of the flood hydrographs were significantly different and can be divided into three parts (0–5 h, 6–10 h, and 11–15 h). The rising rate of the flood stage for each part of the flood hydrograph increases in multiples. According to the analysis of the flood hydrographs, two critical early warning indicators with an invention patent were determined in the study: the flood stage for immediate evacuation and the rising rate. The application of the indicators in the study shows that it is feasible to advance the time of issuing an early warning signal, and it is expected that the indicators can offer a reference for flash flood early warning in the study area and other small watersheds in mountainous areas.

Open-access reader

About this research paper

What this paper is about

Flash floods in mountainous areas have become more severe and frequent as a result of climate change and are a threat to public safety and social development. This study explores the application of distributed hydrological models in flash floods risk management in a small watershed in Sichuan Province, China, and aims to increase early warning lead time in mountainous areas. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC-HMS) model was used to simulate the flash flood process and analyze the variation in flood hydrographs. First, the HEC-HMS model was established based on geospatial data and the river network shape, and eight heavy rainfall events from 2010 to 2015 were used for model calibration and validation, showing that the HEC-HMS model was effective for the simulation of mountain floods in the study area. Second, with the assumption that rainfall and flood events have the same frequency, the flood hydrographs with different frequencies (p = 1%, 2%, 5%, and 10%) were calculated by the HEC-HMS model. The rising limbs of the flood hydrographs were significantly different and can be divided into three parts (0–5 h, 6–10 h, and 11–15 h). The rising rate of the flood stage for each part of the flood hydrograph increases in multiples. According to the analysis of the flood hydrographs, two critical early warning indicators with an invention patent were determined in the study: the flood stage for immediate evacuation and the rising rate. The application of the indicators in the study shows that it is feasible to advance the time of issuing an early warning signal, and it is expected that the indicators can offer a reference for flash flood early warning in the study area and other small watersheds in mountainous areas.

Why it matters

OpenAlex reports 29 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Flash floods in mountainous areas have become more severe and frequent as a result of climate change and are a threat to public safety and social development. This study explores the application of distributed hydrological models in flash floods risk management in a small watershed in Sichuan Province, China, and aims to increase early warning lead time in mountainous areas. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC-HMS) model was used to simulate the flash flood process and analyze the variation in flood hydrographs. First, the HEC-HMS model was established based on geospatial data and the river network shape, and eight heavy rainfall events from 2010 to 2015 were used for model calibration and validation, showing that the HEC-HMS model was effective for the simulation of mountain floods in the study area. Second, with the assumption that rainfall and flood events have the same frequency, the flood hydrographs with different frequencies (p = 1%, 2%, 5%, and 10%) were calculated by the HEC-HMS model. The rising limbs of the flood hydrographs were significantly different and can be divided into three parts (0–5 h, 6–10 h, and 11–15 h). The rising rate of the flood stage for each part of the flood hydrograph increases in multiples. According to the analysis of the flood hydrographs, two critical early warning indicators with an invention patent were determined in the study: the flood stage for immediate evacuation and the rising rate. The application of the indicators in the study shows that it is feasible to advance the time of issuing an early warning signal, and it is expected that the indicators can offer a reference for flash flood early warning in the study area and other small watersheds in mountainous areas.

Key concepts: Flash flood, Hydrograph, Flood myth, Flood forecasting, Environmental science, Hydrology (agriculture), HEC-HMS, Stage (stratigraphy)

Related papers

Back to paper searchBrowse research topicsOriginal source
Flash Flood Early Warning Coupled with Hydrological Simulation and the Rising Rate of the Flood Stage in a Mountainous Small Watershed in Sichuan Province, China — Research Paper | ScholarLens