2019•ACM Transactions on Design Automation of Electronic SystemsRequires access

Real-Time Scheduling of DAG Tasks with Arbitrary Deadlines

Kankan Wang, Xu Jiang, Nan Guan, Di Liu, Weichen Liu, Qingxu Deng

Open publisher page 15 citations

Abstract

Real-time and embedded systems are shifting from single-core to multi-core processors, on which the software must be parallelized to fully utilize the computation capacity of the hardware. Recently, much work has been done on real-time scheduling of parallel tasks modeled as directed acyclic graphs (DAG). However, most of these studies assume tasks to have implicit or constrained deadlines. Much less work considered the general case of arbitrary deadlines (i.e., the relative deadline is allowed to be larger than the period), which is more difficult to analyze due to intra-task interference among jobs. In this article, we study the analysis of Global Earliest Deadline First (GEDF) scheduling for DAG parallel tasks with arbitrary deadlines. We develop new analysis techniques for GEDF scheduling of a single DAG task and this new analysis techniques can guarantee a better capacity augmentation bound 2.41 (the best known result is 2.5) in the case of a single task. Furthermore, the proposed analysis techniques are also extended to the case of multiple DAG tasks under GEDF and federated scheduling. Finally, through empirical evaluation, we justify the out-performance of our schedulability tests compared to the state-of-the-art in general.

About this research paper

What this paper is about

Real-time and embedded systems are shifting from single-core to multi-core processors, on which the software must be parallelized to fully utilize the computation capacity of the hardware. Recently, much work has been done on real-time scheduling of parallel tasks modeled as directed acyclic graphs (DAG). However, most of these studies assume tasks to have implicit or constrained deadlines. Much less work considered the general case of arbitrary deadlines (i.e., the relative deadline is allowed to be larger than the period), which is more difficult to analyze due to intra-task interference among jobs. In this article, we study the analysis of Global Earliest Deadline First (GEDF) scheduling for DAG parallel tasks with arbitrary deadlines. We develop new analysis techniques for GEDF scheduling of a single DAG task and this new analysis techniques can guarantee a better capacity augmentation bound 2.41 (the best known result is 2.5) in the case of a single task. Furthermore, the proposed analysis techniques are also extended to the case of multiple DAG tasks under GEDF and federated scheduling. Finally, through empirical evaluation, we justify the out-performance of our schedulability tests compared to the state-of-the-art in general.

Why it matters

OpenAlex reports 15 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Real-time and embedded systems are shifting from single-core to multi-core processors, on which the software must be parallelized to fully utilize the computation capacity of the hardware. Recently, much work has been done on real-time scheduling of parallel tasks modeled as directed acyclic graphs (DAG). However, most of these studies assume tasks to have implicit or constrained deadlines. Much less work considered the general case of arbitrary deadlines (i.e., the relative deadline is allowed to be larger than the period), which is more difficult to analyze due to intra-task interference among jobs. In this article, we study the analysis of Global Earliest Deadline First (GEDF) scheduling for DAG parallel tasks with arbitrary deadlines. We develop new analysis techniques for GEDF scheduling of a single DAG task and this new analysis techniques can guarantee a better capacity augmentation bound 2.41 (the best known result is 2.5) in the case of a single task. Furthermore, the proposed analysis techniques are also extended to the case of multiple DAG tasks under GEDF and federated scheduling. Finally, through empirical evaluation, we justify the out-performance of our schedulability tests compared to the state-of-the-art in general.

Key concepts: Computer science, Scheduling (production processes), Directed acyclic graph, Parallel computing, Distributed computing, Earliest deadline first scheduling, Processor scheduling, Execution time

Related papers

Back to paper searchBrowse research topicsOriginal source
Real-Time Scheduling of DAG Tasks with Arbitrary Deadlines — Research Paper | ScholarLens