Development of on-line monitoring system for insulation of high voltage electrical equipment
Hang Li, Yaoyao Luo, Yang He, Fangying Li, Ting Wu
Abstract
Open-access reader
Hang Li, Yaoyao Luo, Yang He, Fangying Li, Ting Wu
Abstract
Open-access reader
Abstract The development of on-line monitoring technology for high-voltage electrical equipment insulation, the working principle of online monitoring device, and the problems in operation were comprehensively expounded. The on-site verification technology of high-voltage electrical equipment insulation online monitoring system was studied, and online monitoring was analyzed. Management and technical issues with the device were found. On this basis, the on-site calibration device for the on-line monitoring system of high-voltage electrical equipment insulation was developed. The results of on-site non-power-off verification of high-voltage electrical equipment insulation online monitoring system produced by several manufacturers were introduced. Analysis and elaboration of its key technologies.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Abstract The development of on-line monitoring technology for high-voltage electrical equipment insulation, the working principle of online monitoring device, and the problems in operation were comprehensively expounded. The on-site verification technology of high-voltage electrical equipment insulation online monitoring system was studied, and online monitoring was analyzed. Management and technical issues with the device were found. On this basis, the on-site calibration device for the on-line monitoring system of high-voltage electrical equipment insulation was developed. The results of on-site non-power-off verification of high-voltage electrical equipment insulation online monitoring system produced by several manufacturers were introduced. Analysis and elaboration of its key technologies.
Key concepts: Electrical equipment, Line (geometry), High voltage, Voltage, Electrical engineering, Partial discharge, Engineering, Key (lock)