2017•Unpublished venueRequires access

Hydropower and the water-energy-food nexus

Amaury Tilmant

Open publisher page 2 citations

Abstract

This chapter begins with the water-energy-food (WEF) nexus concepts and continues with the main drivers of the WEF nexus in the Zambezi River Basin, that is to say, hydropower and irrigation developments. It provides a description of physiographic, institutional and environmental factors affecting the WEF nexus in the Zambezi, discussion of challenges and opportunities associated with the WEF nexus approach to planning interventions. The main effort was given to the energy sector, with the construction of hydropower plants and the power utilities holding the principal water rights, while increased irrigation and municipal water demands were dealt with locally. The construction of the largest hydropower plant in the Zambezi started in 1969. The interconnection between power utilities in southern Africa means that the energy generated by the hydropower stations in the Zambezi Basin can be exported over long distances.

About this research paper

What this paper is about

This chapter begins with the water-energy-food (WEF) nexus concepts and continues with the main drivers of the WEF nexus in the Zambezi River Basin, that is to say, hydropower and irrigation developments. It provides a description of physiographic, institutional and environmental factors affecting the WEF nexus in the Zambezi, discussion of challenges and opportunities associated with the WEF nexus approach to planning interventions. The main effort was given to the energy sector, with the construction of hydropower plants and the power utilities holding the principal water rights, while increased irrigation and municipal water demands were dealt with locally. The construction of the largest hydropower plant in the Zambezi started in 1969. The interconnection between power utilities in southern Africa means that the energy generated by the hydropower stations in the Zambezi Basin can be exported over long distances.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This chapter begins with the water-energy-food (WEF) nexus concepts and continues with the main drivers of the WEF nexus in the Zambezi River Basin, that is to say, hydropower and irrigation developments. It provides a description of physiographic, institutional and environmental factors affecting the WEF nexus in the Zambezi, discussion of challenges and opportunities associated with the WEF nexus approach to planning interventions. The main effort was given to the energy sector, with the construction of hydropower plants and the power utilities holding the principal water rights, while increased irrigation and municipal water demands were dealt with locally. The construction of the largest hydropower plant in the Zambezi started in 1969. The interconnection between power utilities in southern Africa means that the energy generated by the hydropower stations in the Zambezi Basin can be exported over long distances.

Key concepts: Hydropower, Water energy, Nexus (standard), Food energy, Environmental science, Water resource management, Engineering, Biology

Related papers

Back to paper searchBrowse research topicsOriginal source
Hydropower and the water-energy-food nexus — Research Paper | ScholarLens