The Potential Benefits of Building Information Modelling (BIM) in Construction Industry
Hilfie Safwan Ibrahim, Norfashiha Hashim, Khairool Aizat Ahmad Jamal
Abstract
Open-access reader
Hilfie Safwan Ibrahim, Norfashiha Hashim, Khairool Aizat Ahmad Jamal
Abstract
Open-access reader
Abstract Construction industry known as complicated, risky and uncertain that certainly contribute to project delay, cost overrun, low product quality and others. Building Information Modelling (BIM) knows as a promising platform that can solve those problems. BIM has been developed at a rapid pace to cope with the increasing complexity and difficulty of project management. The construction players especially contractors still unclear about what BIM truly is, how and when to use it. The purpose of this paper is to explore the extent of which use of BIM producing potential benefits across construction project life phase. The exploration is done by collecting secondary data from 56 contractors (G7) across Klang Valley. The data of were analysed using descriptive analysis which are the frequency analysis, average mean and cross-tab analysis. Based on contractors Level of Development (LOD), most benefits can be obtained were from the Design Phase rather from Construction Phase and Facilities, Operations and Maintenance Phase.
OpenAlex reports 29 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Abstract Construction industry known as complicated, risky and uncertain that certainly contribute to project delay, cost overrun, low product quality and others. Building Information Modelling (BIM) knows as a promising platform that can solve those problems. BIM has been developed at a rapid pace to cope with the increasing complexity and difficulty of project management. The construction players especially contractors still unclear about what BIM truly is, how and when to use it. The purpose of this paper is to explore the extent of which use of BIM producing potential benefits across construction project life phase. The exploration is done by collecting secondary data from 56 contractors (G7) across Klang Valley. The data of were analysed using descriptive analysis which are the frequency analysis, average mean and cross-tab analysis. Based on contractors Level of Development (LOD), most benefits can be obtained were from the Design Phase rather from Construction Phase and Facilities, Operations and Maintenance Phase.
Key concepts: Building information modeling, Pace, Construction industry, Construction engineering, Phase (matter), Cost overrun, Construction management, Quality (philosophy)