The use of the SMED method in improvement of production enterprises
Joanna Stuglik, Zofia Gródek-Szostak, Danuta Kajrunajtys
Abstract
Open-access reader
Joanna Stuglik, Zofia Gródek-Szostak, Danuta Kajrunajtys
Abstract
Open-access reader
The aim of the paper is to present the results of introducing the SMED method on one of the production lines in a selected production company. For the purposes of this study, a single bottling line for filling 200 ml and 250 ml glass bottles with carbonated drinks was selected. Upon analyzing the process of mixer washing in terms of time, it was shown that in individual steps, the total single washing time was 5 hours 3 minutes on average, which accounted for about 19% of the total retooling of the production line. However, after using the SMED method, this process has taken 3 hours 50 minutes. Thus, a saving of 1 hour 13 minutes was obtained after shortening the retooling, which allowed to extend the production process.
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The aim of the paper is to present the results of introducing the SMED method on one of the production lines in a selected production company. For the purposes of this study, a single bottling line for filling 200 ml and 250 ml glass bottles with carbonated drinks was selected. Upon analyzing the process of mixer washing in terms of time, it was shown that in individual steps, the total single washing time was 5 hours 3 minutes on average, which accounted for about 19% of the total retooling of the production line. However, after using the SMED method, this process has taken 3 hours 50 minutes. Thus, a saving of 1 hour 13 minutes was obtained after shortening the retooling, which allowed to extend the production process.
Key concepts: Bottling line, Production (economics), Production line, Process (computing), Pulp and paper industry, Business, Operations management, Process engineering