2020•Indonesian Journal of Electrical Engineering and Computer ScienceOpen access

Solving assembly line balancing problem using heuristic: a case study of power transformer in electrical industry

Nurhanani Abu Bakar, Mohammad Fadzli Ramli, Mohd Zakimi Zakaria, Tan Chan Sin, Hafiz Masran

Open full text 8 citations

Abstract

Currently, problem in assembly line has created so much attention, particularly in manufacturing area. Similar to this case study as they faced with problems regarding workstation in production line of electrical industry. There exist some cases where workstations in assembly line are experienced with bottleneck and suffered from high idle time. Thus, four heuristic methods are used for minimizing number or workstations and improve the bottleneck problems at the same time. In this case study, LCR, RPW and LPT have successfully minimized the number of workstations from 19 to 16. This solution has affected the layout of assembly line. Different from SPT that manage to improve the bottleneck among workstations by reducing number of workstations from 19 to 17 without changing the line layout. Therefore, both solution has brought an option for an engineer to choose which decision to be used in this assembly line in order to increase the line efficiency.

Open-access reader

About this research paper

What this paper is about

Currently, problem in assembly line has created so much attention, particularly in manufacturing area. Similar to this case study as they faced with problems regarding workstation in production line of electrical industry. There exist some cases where workstations in assembly line are experienced with bottleneck and suffered from high idle time. Thus, four heuristic methods are used for minimizing number or workstations and improve the bottleneck problems at the same time. In this case study, LCR, RPW and LPT have successfully minimized the number of workstations from 19 to 16. This solution has affected the layout of assembly line. Different from SPT that manage to improve the bottleneck among workstations by reducing number of workstations from 19 to 17 without changing the line layout. Therefore, both solution has brought an option for an engineer to choose which decision to be used in this assembly line in order to increase the line efficiency.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Currently, problem in assembly line has created so much attention, particularly in manufacturing area. Similar to this case study as they faced with problems regarding workstation in production line of electrical industry. There exist some cases where workstations in assembly line are experienced with bottleneck and suffered from high idle time. Thus, four heuristic methods are used for minimizing number or workstations and improve the bottleneck problems at the same time. In this case study, LCR, RPW and LPT have successfully minimized the number of workstations from 19 to 16. This solution has affected the layout of assembly line. Different from SPT that manage to improve the bottleneck among workstations by reducing number of workstations from 19 to 17 without changing the line layout. Therefore, both solution has brought an option for an engineer to choose which decision to be used in this assembly line in order to increase the line efficiency.

Key concepts: Bottleneck, Workstation, Heuristic, Assembly line, Computer science, Line (geometry), Electrical machinery, Transformer

Related papers

Back to paper searchBrowse research topicsOriginal source
Solving assembly line balancing problem using heuristic: a case study of power transformer in electrical industry — Research Paper | ScholarLens