Supply Chain Risk of Obsolescence at Simultaneous Robust Perturbations

Francisco Campuzano Bolarín, Fulgencio Marín-García, José Andrés Moreno-Nicolás, Marija Bogataj, David Bogataj

Open full text 11 citations

Abstract

The earlier planning methods of supply chains (SC) in the skeleton of the extended material requirements planning (EMRP), where the time horizon of the reverse Laplace is infinite, were not convenient to estimate the impact of the technical obsolescence of the product or technology involved, which has economic, environmental, and social consequences. Therefore, the perturbations of timing are presented until the possible obsolescence, with parallel execution of the network simulation model (NSM) to evaluate the impact of the finite lifespan on the value of the chain. The EMRP, as well as the NSM, are based on the skeleton of the material requirements planning model, where delays and their perturbations are presented transparently. Contrary to the previous studies of the net present value (NPV) in the EMRP skeleton, where the infinite horizon is assumed, the impact of shortening the horizon of activities is shown here, in order to also evaluate the risk of financing investments in the SC with a shorter lifespan of products or technology. Owing to the simultaneous appearances of the stochastic variables, the parallel execution and exchanging of data, using NSM is advised. The procedures for estimation of correction factors of the NPV and their values are given.

Open-access reader

About this research paper

What this paper is about

The earlier planning methods of supply chains (SC) in the skeleton of the extended material requirements planning (EMRP), where the time horizon of the reverse Laplace is infinite, were not convenient to estimate the impact of the technical obsolescence of the product or technology involved, which has economic, environmental, and social consequences. Therefore, the perturbations of timing are presented until the possible obsolescence, with parallel execution of the network simulation model (NSM) to evaluate the impact of the finite lifespan on the value of the chain. The EMRP, as well as the NSM, are based on the skeleton of the material requirements planning model, where delays and their perturbations are presented transparently. Contrary to the previous studies of the net present value (NPV) in the EMRP skeleton, where the infinite horizon is assumed, the impact of shortening the horizon of activities is shown here, in order to also evaluate the risk of financing investments in the SC with a shorter lifespan of products or technology. Owing to the simultaneous appearances of the stochastic variables, the parallel execution and exchanging of data, using NSM is advised. The procedures for estimation of correction factors of the NPV and their values are given.

Why it matters

OpenAlex reports 11 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The earlier planning methods of supply chains (SC) in the skeleton of the extended material requirements planning (EMRP), where the time horizon of the reverse Laplace is infinite, were not convenient to estimate the impact of the technical obsolescence of the product or technology involved, which has economic, environmental, and social consequences. Therefore, the perturbations of timing are presented until the possible obsolescence, with parallel execution of the network simulation model (NSM) to evaluate the impact of the finite lifespan on the value of the chain. The EMRP, as well as the NSM, are based on the skeleton of the material requirements planning model, where delays and their perturbations are presented transparently. Contrary to the previous studies of the net present value (NPV) in the EMRP skeleton, where the infinite horizon is assumed, the impact of shortening the horizon of activities is shown here, in order to also evaluate the risk of financing investments in the SC with a shorter lifespan of products or technology. Owing to the simultaneous appearances of the stochastic variables, the parallel execution and exchanging of data, using NSM is advised. The procedures for estimation of correction factors of the NPV and their values are given.

Key concepts: Obsolescence, Time horizon, Supply chain, Computer science, Horizon, Skeleton (computer programming), Net present value, Value (mathematics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Supply Chain Risk of Obsolescence at Simultaneous Robust Perturbations — Research Paper | ScholarLens