The application of lime soil compaction pile in virtual filling treatment
Wang Zhi-gu
Abstract
Wang Zhi-gu
Abstract
Combined with the specific engineering,the lime-soil compaction pile construction method was introduced from ground leveling,feed preparation,trial pile,pore-forming,pile hole checking and quality inspection.The characteristics of lime-soil compaction pile method were generalized,some favorable construction conclusions were obtained,which can be referenced for the similar engineering construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with the specific engineering,the lime-soil compaction pile construction method was introduced from ground leveling,feed preparation,trial pile,pore-forming,pile hole checking and quality inspection.The characteristics of lime-soil compaction pile method were generalized,some favorable construction conclusions were obtained,which can be referenced for the similar engineering construction.
Key concepts: Pile, Lime, Compaction, Geotechnical engineering, Soil compaction, Engineering, Geology, Environmental science