NASA's Space Launch System: First Mission Hardware Nears Completion

John Honeycutt, Chris Cianciola

Open publisher page 3 citations

Abstract

The Space Launch System (SLS) Program (Fig. 1) completed several significant production milestones in 2018 for its first mission and is poised for greater accomplishments in 2019. With manufacturing and hardware installation complete, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success and scientific discovery. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

About this research paper

What this paper is about

The Space Launch System (SLS) Program (Fig. 1) completed several significant production milestones in 2018 for its first mission and is poised for greater accomplishments in 2019. With manufacturing and hardware installation complete, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success and scientific discovery. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Space Launch System (SLS) Program (Fig. 1) completed several significant production milestones in 2018 for its first mission and is poised for greater accomplishments in 2019. With manufacturing and hardware installation complete, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success and scientific discovery. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Key concepts: Computer science, Aerospace engineering, Aeronautics, Launch vehicle, Space (punctuation), Space launch, Completion (oil and gas wells), Space exploration

Related papers

Back to paper searchBrowse research topicsOriginal source
NASA's Space Launch System: First Mission Hardware Nears Completion — Research Paper | ScholarLens