The construction of girder bridges

Author information unavailable

Open publisher page 0 citations

Abstract

There is a close link between the designer’s choice of bridge deck type and the most appropriate method of construction. In general, solid and voided slabs and twin rib decks are appropriate for the cast-in-situ construction of complete spans on falsework, while box sections are most easily cast in-situ in short sections, or precast. One reasonable rule of thumb is that if a deck is to be cast in-situ on falsework it should be possible to pour a complete span in one continuous operation.

About this research paper

What this paper is about

There is a close link between the designer’s choice of bridge deck type and the most appropriate method of construction. In general, solid and voided slabs and twin rib decks are appropriate for the cast-in-situ construction of complete spans on falsework, while box sections are most easily cast in-situ in short sections, or precast. One reasonable rule of thumb is that if a deck is to be cast in-situ on falsework it should be possible to pour a complete span in one continuous operation.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

There is a close link between the designer’s choice of bridge deck type and the most appropriate method of construction. In general, solid and voided slabs and twin rib decks are appropriate for the cast-in-situ construction of complete spans on falsework, while box sections are most easily cast in-situ in short sections, or precast. One reasonable rule of thumb is that if a deck is to be cast in-situ on falsework it should be possible to pour a complete span in one continuous operation.

Key concepts: Girder, Structural engineering, Geology, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The construction of girder bridges — Research Paper | ScholarLens