The construction of girder bridges
Author information unavailable
Abstract
Author information unavailable
Abstract
There is a close link between the designer’s choice of bridge deck type and the most appropriate method of construction. In general, solid and voided slabs and twin rib decks are appropriate for the cast-in-situ construction of complete spans on falsework, while box sections are most easily cast in-situ in short sections, or precast. One reasonable rule of thumb is that if a deck is to be cast in-situ on falsework it should be possible to pour a complete span in one continuous operation.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
There is a close link between the designer’s choice of bridge deck type and the most appropriate method of construction. In general, solid and voided slabs and twin rib decks are appropriate for the cast-in-situ construction of complete spans on falsework, while box sections are most easily cast in-situ in short sections, or precast. One reasonable rule of thumb is that if a deck is to be cast in-situ on falsework it should be possible to pour a complete span in one continuous operation.
Key concepts: Girder, Structural engineering, Geology, Engineering