Abstract In order to develop a technology and equipment for remelting waste from the ferroalloy industry, the Yurga ferroalloy plant gives 1500 kg of ferrosilicon waste to “Sibelektroterm” for experimental smelts and formulation of technical requirements for new remelting equipment. The findings of these operations are presented in this article. The results of experimental ferroalloy waste processing smelts in a direct-current furnace with the power of 140 kW are examined; parameters of three-phase electric furnaces of alternating current with power 0.63-6.3 MV·A and technologies of ferroalloy waste processing are examined. In addition, original characteristics of the waste are considered. Remelting of ferrosilicon waste in three-phase alternating current furnaces is considered.

Open-access reader

About this research paper

What this paper is about

Abstract In order to develop a technology and equipment for remelting waste from the ferroalloy industry, the Yurga ferroalloy plant gives 1500 kg of ferrosilicon waste to “Sibelektroterm” for experimental smelts and formulation of technical requirements for new remelting equipment. The findings of these operations are presented in this article. The results of experimental ferroalloy waste processing smelts in a direct-current furnace with the power of 140 kW are examined; parameters of three-phase electric furnaces of alternating current with power 0.63-6.3 MV·A and technologies of ferroalloy waste processing are examined. In addition, original characteristics of the waste are considered. Remelting of ferrosilicon waste in three-phase alternating current furnaces is considered.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract In order to develop a technology and equipment for remelting waste from the ferroalloy industry, the Yurga ferroalloy plant gives 1500 kg of ferrosilicon waste to “Sibelektroterm” for experimental smelts and formulation of technical requirements for new remelting equipment. The findings of these operations are presented in this article. The results of experimental ferroalloy waste processing smelts in a direct-current furnace with the power of 140 kW are examined; parameters of three-phase electric furnaces of alternating current with power 0.63-6.3 MV·A and technologies of ferroalloy waste processing are examined. In addition, original characteristics of the waste are considered. Remelting of ferrosilicon waste in three-phase alternating current furnaces is considered.

Key concepts: Ferroalloy, Ferrosilicon, Waste management, Engineering, Environmental science, Metallurgy, Materials science, Alloy

Related papers

Back to paper searchBrowse research topicsOriginal source
Ferroalloy industry waste processing — Research Paper | ScholarLens