2019IEEE Transactions on ReliabilityRequires access

Preventive Maintenance Subject to Equipment Unavailability

Zhicheng Zhu, Yisha Xiang, Mingyang Li, Weihang Zhu, Kellie Schneider

Open publisher page 23 citations

Abstract

Preventive maintenance has received considerable attention in industries and the literature. Conventional preventive maintenance models often assume that equipment is always available for maintenance activities. However, in many mission-critical industries, equipment may not be available for scheduled maintenance due to busy operational schedules. Forced shutdown of the equipment may incur extra costs that cannot be offset by the benefits from preventively maintaining the equipment. In this paper, we propose innovative preventive maintenance policies to address the challenges caused by equipment unavailability. Maintenance models with possible rescheduling are developed for both time-based and condition-based maintenance policies, and the objective is to minimize the long-run cost rate of all maintenance activities. The proposed policies, with consideration of equipment unavailability for prescheduled PM, are compared with the policies that ignore this unavailability. Numerical examples are provided to illustrate the proposed policies.

About this research paper

What this paper is about

Preventive maintenance has received considerable attention in industries and the literature. Conventional preventive maintenance models often assume that equipment is always available for maintenance activities. However, in many mission-critical industries, equipment may not be available for scheduled maintenance due to busy operational schedules. Forced shutdown of the equipment may incur extra costs that cannot be offset by the benefits from preventively maintaining the equipment. In this paper, we propose innovative preventive maintenance policies to address the challenges caused by equipment unavailability. Maintenance models with possible rescheduling are developed for both time-based and condition-based maintenance policies, and the objective is to minimize the long-run cost rate of all maintenance activities. The proposed policies, with consideration of equipment unavailability for prescheduled PM, are compared with the policies that ignore this unavailability. Numerical examples are provided to illustrate the proposed policies.

Why it matters

OpenAlex reports 23 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Preventive maintenance has received considerable attention in industries and the literature. Conventional preventive maintenance models often assume that equipment is always available for maintenance activities. However, in many mission-critical industries, equipment may not be available for scheduled maintenance due to busy operational schedules. Forced shutdown of the equipment may incur extra costs that cannot be offset by the benefits from preventively maintaining the equipment. In this paper, we propose innovative preventive maintenance policies to address the challenges caused by equipment unavailability. Maintenance models with possible rescheduling are developed for both time-based and condition-based maintenance policies, and the objective is to minimize the long-run cost rate of all maintenance activities. The proposed policies, with consideration of equipment unavailability for prescheduled PM, are compared with the policies that ignore this unavailability. Numerical examples are provided to illustrate the proposed policies.

Key concepts: Unavailability, Preventive maintenance, Corrective maintenance, Maintenance engineering, Reliability engineering, Proactive maintenance, Planned maintenance, Offset (computer science)

Related papers

Back to paper searchBrowse research topicsOriginal source
Preventive Maintenance Subject to Equipment Unavailability — Research Paper | ScholarLens