SPIRAL2 Injector Commissioning

R. Ferdinand, Marco Di Giacomo, H. Frånberg, O. Kamalou, Jean-Michel Lagniel, Guillaume Normand, Alain Savalle, D. Uriot, Franck Varenne

Open full text 3 citations

Abstract

The SPIRAL2 injector is composed of two ion sources (p/d and heavy ions up to A/Q=3) followed by a 730 keV/u RFQ. Beam commissioning has started in 2014 in parallel with the superconducting linac and HEBT installations. The RFQ beam commissioning started soon after the first RF conditioning done in October 2015. This paper describes the RFQ beam measurements done on the diagnostic plate for the reference particles (H⁺, 4He2+ and recently 18O6+) and the difficulties encountered for the RFQ commissioning at the A/Q=3 field level.

About this research paper

What this paper is about

The SPIRAL2 injector is composed of two ion sources (p/d and heavy ions up to A/Q=3) followed by a 730 keV/u RFQ. Beam commissioning has started in 2014 in parallel with the superconducting linac and HEBT installations. The RFQ beam commissioning started soon after the first RF conditioning done in October 2015. This paper describes the RFQ beam measurements done on the diagnostic plate for the reference particles (H⁺, 4He2+ and recently 18O6+) and the difficulties encountered for the RFQ commissioning at the A/Q=3 field level.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The SPIRAL2 injector is composed of two ion sources (p/d and heavy ions up to A/Q=3) followed by a 730 keV/u RFQ. Beam commissioning has started in 2014 in parallel with the superconducting linac and HEBT installations. The RFQ beam commissioning started soon after the first RF conditioning done in October 2015. This paper describes the RFQ beam measurements done on the diagnostic plate for the reference particles (H⁺, 4He2+ and recently 18O6+) and the difficulties encountered for the RFQ commissioning at the A/Q=3 field level.

Key concepts: Injector, Project commissioning, Computer science, Engineering, Mechanical engineering, Publishing, Political science, Law

Related papers

Back to paper searchBrowse research topicsOriginal source
SPIRAL2 Injector Commissioning — Research Paper | ScholarLens