2019Scientia IranicaOpen access

Extended Economic Production Quantity Models with Preventive Maintenance

Hadi Mokhtari, Javad Asadkhani

Open full text 13 citations

Abstract

This paper generalizes the standard economic production quantity (EPQ) model in process manufacturing industry by incorporating regular preventive maintenance (PM) activities into classic EPQ model. The PM program improves the condition of the production to an acceptable level, and avoids potential stoppages and disruptions, hence, it is a vital task in every production process. However, the standard EPQ model does not consider PM activities and then is not applicable to real-world situations. We consider manufacturer which produces a product under EPQ setting with a defective production process, in which every production cycle involves a number of sub-production cycles. Two models are proposed, based on the disposal time of defective items, to determine optimal number of sub-production cycles. In model I, the disposal of defective items is performed once per cycle at the end of each production cycle, while in model II, the disposal of defective items is performed multiple times per cycle, at the end of each sub-production cycle. The total cost functions are derived for each model separately, and then simple solution algorithms are designed. A numerical example is presented and discussed to evaluate proposed models. The results illustrate that model II is more cost effective than model I.

Open-access reader

About this research paper

What this paper is about

This paper generalizes the standard economic production quantity (EPQ) model in process manufacturing industry by incorporating regular preventive maintenance (PM) activities into classic EPQ model. The PM program improves the condition of the production to an acceptable level, and avoids potential stoppages and disruptions, hence, it is a vital task in every production process. However, the standard EPQ model does not consider PM activities and then is not applicable to real-world situations. We consider manufacturer which produces a product under EPQ setting with a defective production process, in which every production cycle involves a number of sub-production cycles. Two models are proposed, based on the disposal time of defective items, to determine optimal number of sub-production cycles. In model I, the disposal of defective items is performed once per cycle at the end of each production cycle, while in model II, the disposal of defective items is performed multiple times per cycle, at the end of each sub-production cycle. The total cost functions are derived for each model separately, and then simple solution algorithms are designed. A numerical example is presented and discussed to evaluate proposed models. The results illustrate that model II is more cost effective than model I.

Why it matters

OpenAlex reports 13 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper generalizes the standard economic production quantity (EPQ) model in process manufacturing industry by incorporating regular preventive maintenance (PM) activities into classic EPQ model. The PM program improves the condition of the production to an acceptable level, and avoids potential stoppages and disruptions, hence, it is a vital task in every production process. However, the standard EPQ model does not consider PM activities and then is not applicable to real-world situations. We consider manufacturer which produces a product under EPQ setting with a defective production process, in which every production cycle involves a number of sub-production cycles. Two models are proposed, based on the disposal time of defective items, to determine optimal number of sub-production cycles. In model I, the disposal of defective items is performed once per cycle at the end of each production cycle, while in model II, the disposal of defective items is performed multiple times per cycle, at the end of each sub-production cycle. The total cost functions are derived for each model separately, and then simple solution algorithms are designed. A numerical example is presented and discussed to evaluate proposed models. The results illustrate that model II is more cost effective than model I.

Key concepts: Economic production quantity, Production (economics), Preventive maintenance, Task (project management), Process (computing), Computer science, Product (mathematics), Production cycle

Related papers

Back to paper searchBrowse research topicsOriginal source
Extended Economic Production Quantity Models with Preventive Maintenance — Research Paper | ScholarLens