2018Journal of International Conference ProceedingsOpen access

Analysis of the Needs of Concrete Iron Material Availability in The Work of the Chhazan Space Through the Eoq Approach Method (Case study: Project for Building a Bank Indonesia Representative Office for Gorontalo Province)

Stella Junus, Muh. Yasser Arafat, Dwi Rahmania Noviani, Sofiyah H. Sabaya

Open full text 0 citations

Abstract

PT. Housing Development (Persero). tbk or PT. PP is a state-owned company engaged in construction and investment with experience in building prestigious buildings, infrastructure, properties and Engineering Procurement Construction (EPC) for more than 60 years. The purpose of this study is to get the right technique in obtaining the number of material orders (lot size) that can form the minimum cost and to get the minimum total cost (total cost) of material inventories. This research method is the Eoq Method Approach. The results showed that D16 mm Concrete Iron the number of economic installations amounted to 38, 995.59 Kg and inventory costs of Rp. 76,821.32, concrete iron D25 mm the number of economical orders amounted to 11,264.90 Kg and the total cost of Rp 22,190.54, and concrete iron D32 mm the number of economic orders was 11,646.90 Kg and the total cost of Rp 20,636.83. Keywords: EOQ, Materials, Supplies

Open-access reader

About this research paper

What this paper is about

PT. Housing Development (Persero). tbk or PT. PP is a state-owned company engaged in construction and investment with experience in building prestigious buildings, infrastructure, properties and Engineering Procurement Construction (EPC) for more than 60 years. The purpose of this study is to get the right technique in obtaining the number of material orders (lot size) that can form the minimum cost and to get the minimum total cost (total cost) of material inventories. This research method is the Eoq Method Approach. The results showed that D16 mm Concrete Iron the number of economic installations amounted to 38, 995.59 Kg and inventory costs of Rp. 76,821.32, concrete iron D25 mm the number of economical orders amounted to 11,264.90 Kg and the total cost of Rp 22,190.54, and concrete iron D32 mm the number of economic orders was 11,646.90 Kg and the total cost of Rp 20,636.83. Keywords: EOQ, Materials, Supplies

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

PT. Housing Development (Persero). tbk or PT. PP is a state-owned company engaged in construction and investment with experience in building prestigious buildings, infrastructure, properties and Engineering Procurement Construction (EPC) for more than 60 years. The purpose of this study is to get the right technique in obtaining the number of material orders (lot size) that can form the minimum cost and to get the minimum total cost (total cost) of material inventories. This research method is the Eoq Method Approach. The results showed that D16 mm Concrete Iron the number of economic installations amounted to 38, 995.59 Kg and inventory costs of Rp. 76,821.32, concrete iron D25 mm the number of economical orders amounted to 11,264.90 Kg and the total cost of Rp 22,190.54, and concrete iron D32 mm the number of economic orders was 11,646.90 Kg and the total cost of Rp 20,636.83. Keywords: EOQ, Materials, Supplies

Key concepts: Economic order quantity, Procurement, Total cost, Investment (military), Work (physics), Operations management, Business, Operations research