2019Transactions of the Atomic Energy Society of JapanOpen access

Enhancing Emergency Response in the Field Based on Analysis of Workload Distribution at Fukushima Daiichi Nuclear Power Station

Atsufumi Yoshizawa, Kyoko Oba, Masaharu Kitamura

Open full text 0 citations

Abstract

This study aims to improve the potential of an emergency response by analyzing the workload management during the accident at the Emergency Response Center (ERC) of TEPCO’s Fukushima Daiichi Nuclear Power Plant. Specifically, the research focused on the response of the ERC during the time between the discontinuation of Unit 3 core water injection and its recovery. It identified the different types of workload at the ERC had and how they had been managed based on the record of a TV conference. It also deduced the casual factors of the responses, supplementing the interview record of the director of ERC at the time by applying workload management analysis. On the basis of these findings, lessons to enhance the potential of the on-site emergency response have been obtained for ERC and outside organizations.

Open-access reader

About this research paper

What this paper is about

This study aims to improve the potential of an emergency response by analyzing the workload management during the accident at the Emergency Response Center (ERC) of TEPCO’s Fukushima Daiichi Nuclear Power Plant. Specifically, the research focused on the response of the ERC during the time between the discontinuation of Unit 3 core water injection and its recovery. It identified the different types of workload at the ERC had and how they had been managed based on the record of a TV conference. It also deduced the casual factors of the responses, supplementing the interview record of the director of ERC at the time by applying workload management analysis. On the basis of these findings, lessons to enhance the potential of the on-site emergency response have been obtained for ERC and outside organizations.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This study aims to improve the potential of an emergency response by analyzing the workload management during the accident at the Emergency Response Center (ERC) of TEPCO’s Fukushima Daiichi Nuclear Power Plant. Specifically, the research focused on the response of the ERC during the time between the discontinuation of Unit 3 core water injection and its recovery. It identified the different types of workload at the ERC had and how they had been managed based on the record of a TV conference. It also deduced the casual factors of the responses, supplementing the interview record of the director of ERC at the time by applying workload management analysis. On the basis of these findings, lessons to enhance the potential of the on-site emergency response have been obtained for ERC and outside organizations.

Key concepts: Workload, Emergency response, Nuclear power, Casual, Fukushima Nuclear Accident, Nuclear power plant, Emergency management, Medical emergency

Related papers

Back to paper searchBrowse research topicsOriginal source
Enhancing Emergency Response in the Field Based on Analysis of Workload Distribution at Fukushima Daiichi Nuclear Power Station — Research Paper | ScholarLens