A Mathematical Model for Two-sided Assembly Line Balancing Problem in Motorcycle Production
Fatini Dalili Mohammed, Tan Wan Juin, Mohd Zakimi Zakaria, Mohammad Fadzli Ramli
Abstract
Fatini Dalili Mohammed, Tan Wan Juin, Mohd Zakimi Zakaria, Mohammad Fadzli Ramli
Abstract
In order to produce a good efficiency in production and costs reduction, assembly line balancing plays an important role in modern manufacturing industries. Assembly line balancing problem (ALBP) is the problem that allow assigning of the tasks to the workstations so that the objective functions that have being set are optimized. The aim of this study is to develop a mathematical model for two-sided single model assembly line (TALBP). This paper considers motorcycle industry as one of the scope. Initial studies were carried out using mathematical model, then it is optimized by using Ranked Positional Weight (RPW) method. Nevertheless, the number of workstations does not been minimize which is 24 workstations. This was probably as a result of some other factors such as the positional constraints and immediate predecessor.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In order to produce a good efficiency in production and costs reduction, assembly line balancing plays an important role in modern manufacturing industries. Assembly line balancing problem (ALBP) is the problem that allow assigning of the tasks to the workstations so that the objective functions that have being set are optimized. The aim of this study is to develop a mathematical model for two-sided single model assembly line (TALBP). This paper considers motorcycle industry as one of the scope. Initial studies were carried out using mathematical model, then it is optimized by using Ranked Positional Weight (RPW) method. Nevertheless, the number of workstations does not been minimize which is 24 workstations. This was probably as a result of some other factors such as the positional constraints and immediate predecessor.
Key concepts: Workstation, Assembly line, Computer science, Scope (computer science), Reduction (mathematics), Production line, Line (geometry), Set (abstract data type)