2019AIP conference proceedingsRequires access

First pass yield improvement in fuel injection pump delivery valve assembly

Raghavendra Pai, Vinayaka Kannantha, Naveen Kumar Jagadapura Ramegowda, Lokesh Kanchugaranahally Sriramamurthy

Open publisher page 1 citations

Abstract

This work was carried out in an automotive sector, for single cylinder fuel injection pump (pf-33) delivery valve assembly line. Our work aims to focus on internal quality improvement to reduce rejection in a delivery Valve assembly line, which was having around 10.5% scrap. A substantial improvement of around 60% we estimated after the completion of work. The present work also signifies the data regarding the two significant rejections were taken for study as per Pareto Analysis from three months of rejection data. Observed that a significant problem with Delivery Valve (DV) through flow measurement is because the machine to test the through flow did not attain standard specification limits, and the method of assembly of parts needs to be improved as it caused misalignment. Some via simple techniques like the “seven basic quality control (QC) tools” and also why-Why analysis provided a valuable and cost-effective way to solve the problem. Of these various techniques, some tools and techniques like Cause & Effect Diagram, Pareto Analysis and Bar charts were mainly used. Brainstorming sessions were set and executed to identify the leading root causes of rejections in the assembly line. Several benefits have been observed from this work is that increase in productivity, reduction in Work In Progress (WIP) and improved production techniques.

About this research paper

What this paper is about

This work was carried out in an automotive sector, for single cylinder fuel injection pump (pf-33) delivery valve assembly line. Our work aims to focus on internal quality improvement to reduce rejection in a delivery Valve assembly line, which was having around 10.5% scrap. A substantial improvement of around 60% we estimated after the completion of work. The present work also signifies the data regarding the two significant rejections were taken for study as per Pareto Analysis from three months of rejection data. Observed that a significant problem with Delivery Valve (DV) through flow measurement is because the machine to test the through flow did not attain standard specification limits, and the method of assembly of parts needs to be improved as it caused misalignment. Some via simple techniques like the “seven basic quality control (QC) tools” and also why-Why analysis provided a valuable and cost-effective way to solve the problem. Of these various techniques, some tools and techniques like Cause & Effect Diagram, Pareto Analysis and Bar charts were mainly used. Brainstorming sessions were set and executed to identify the leading root causes of rejections in the assembly line. Several benefits have been observed from this work is that increase in productivity, reduction in Work In Progress (WIP) and improved production techniques.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This work was carried out in an automotive sector, for single cylinder fuel injection pump (pf-33) delivery valve assembly line. Our work aims to focus on internal quality improvement to reduce rejection in a delivery Valve assembly line, which was having around 10.5% scrap. A substantial improvement of around 60% we estimated after the completion of work. The present work also signifies the data regarding the two significant rejections were taken for study as per Pareto Analysis from three months of rejection data. Observed that a significant problem with Delivery Valve (DV) through flow measurement is because the machine to test the through flow did not attain standard specification limits, and the method of assembly of parts needs to be improved as it caused misalignment. Some via simple techniques like the “seven basic quality control (QC) tools” and also why-Why analysis provided a valuable and cost-effective way to solve the problem. Of these various techniques, some tools and techniques like Cause & Effect Diagram, Pareto Analysis and Bar charts were mainly used. Brainstorming sessions were set and executed to identify the leading root causes of rejections in the assembly line. Several benefits have been observed from this work is that increase in productivity, reduction in Work In Progress (WIP) and improved production techniques.

Key concepts: Pareto chart, Production line, Computer science, Automotive industry, Pareto analysis, Work (physics), Pareto principle, Automotive engineering