2020Unpublished venueRequires access

Phosphorus Removal from Wastewater in a Constructed Wetland

T. H. Davies, P Cottingham

Open publisher page 26 citations

Abstract

In a constructed wetland using a high hydraulic conductivity matrix such as gravel, the wastewater will flow subsurface in the root and rhizome region of the aquatic macrophyte where bacterial growth on the surfaces can absorb pollutants and break them down. Bacteria can assimilate phosphorus in their cell structures; but once a steady state of biomass is reached within the bed, no net phosphorus removal will result thereafter. From the foregoing, the conversion of the soluble phosphorus to an insoluble particulate form which would be contained within the bed, by chemical means, would be an efficient method of removal. Two experimental gravel matrix constructed wetlands, each 30 m long × 5 m wide, one planted with Phragmites australis and the other an unplanted control, were selected for the dosing experiments. The use of lime plus alum is shown to be an economic and efficient dosing mixture for the removal of phosphorus as the insoluble phosphate within the bed itself.

About this research paper

What this paper is about

In a constructed wetland using a high hydraulic conductivity matrix such as gravel, the wastewater will flow subsurface in the root and rhizome region of the aquatic macrophyte where bacterial growth on the surfaces can absorb pollutants and break them down. Bacteria can assimilate phosphorus in their cell structures; but once a steady state of biomass is reached within the bed, no net phosphorus removal will result thereafter. From the foregoing, the conversion of the soluble phosphorus to an insoluble particulate form which would be contained within the bed, by chemical means, would be an efficient method of removal. Two experimental gravel matrix constructed wetlands, each 30 m long × 5 m wide, one planted with Phragmites australis and the other an unplanted control, were selected for the dosing experiments. The use of lime plus alum is shown to be an economic and efficient dosing mixture for the removal of phosphorus as the insoluble phosphate within the bed itself.

Why it matters

OpenAlex reports 26 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In a constructed wetland using a high hydraulic conductivity matrix such as gravel, the wastewater will flow subsurface in the root and rhizome region of the aquatic macrophyte where bacterial growth on the surfaces can absorb pollutants and break them down. Bacteria can assimilate phosphorus in their cell structures; but once a steady state of biomass is reached within the bed, no net phosphorus removal will result thereafter. From the foregoing, the conversion of the soluble phosphorus to an insoluble particulate form which would be contained within the bed, by chemical means, would be an efficient method of removal. Two experimental gravel matrix constructed wetlands, each 30 m long × 5 m wide, one planted with Phragmites australis and the other an unplanted control, were selected for the dosing experiments. The use of lime plus alum is shown to be an economic and efficient dosing mixture for the removal of phosphorus as the insoluble phosphate within the bed itself.

Key concepts: Wetland, Wastewater, Phosphorus, Environmental science, Environmental engineering, Constructed wetland, Water resource management, Waste management

Related papers

Back to paper searchBrowse research topicsOriginal source
Phosphorus Removal from Wastewater in a Constructed Wetland — Research Paper | ScholarLens