2018Kalpa publications in civil engineeringOpen access

Categorization of Construction Waste

Parth Raval, Jaydev J. Bhavsar, Dharmesh Oza

Open full text 3 citations

Abstract

Waste in the construction industry has been the theme of several research projects around the world in recent years. Researchers implement different methods to reduce the amount of waste in the construction industry. In the construction industry, contractors only consider physical waste which leads the project to cost overruns. i.e. material waste. Construction industry is also affected by time overrun. Impact of time overrun on the construction projects is considerably high and requires special attention in addition to physical waste. In the present study, construction waste is categorized in mainly of two types: value added waste and non-value added waste. This categorization includes both-material waste as well as time waste, which are main causes of occurrence of waste. A case study was also carried out at a residential building project in Ahmedabad, Gujarat to get the idea about the percentage of waste occurs in a construction project.

Open-access reader

About this research paper

What this paper is about

Waste in the construction industry has been the theme of several research projects around the world in recent years. Researchers implement different methods to reduce the amount of waste in the construction industry. In the construction industry, contractors only consider physical waste which leads the project to cost overruns. i.e. material waste. Construction industry is also affected by time overrun. Impact of time overrun on the construction projects is considerably high and requires special attention in addition to physical waste. In the present study, construction waste is categorized in mainly of two types: value added waste and non-value added waste. This categorization includes both-material waste as well as time waste, which are main causes of occurrence of waste. A case study was also carried out at a residential building project in Ahmedabad, Gujarat to get the idea about the percentage of waste occurs in a construction project.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Waste in the construction industry has been the theme of several research projects around the world in recent years. Researchers implement different methods to reduce the amount of waste in the construction industry. In the construction industry, contractors only consider physical waste which leads the project to cost overruns. i.e. material waste. Construction industry is also affected by time overrun. Impact of time overrun on the construction projects is considerably high and requires special attention in addition to physical waste. In the present study, construction waste is categorized in mainly of two types: value added waste and non-value added waste. This categorization includes both-material waste as well as time waste, which are main causes of occurrence of waste. A case study was also carried out at a residential building project in Ahmedabad, Gujarat to get the idea about the percentage of waste occurs in a construction project.

Key concepts: Construction waste, Construction industry, Waste management, Waste material, Categorization, Engineering, Construction engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Categorization of Construction Waste — Research Paper | ScholarLens