1980•Defense Technical Information Center (DTIC)Requires access

National Dam Safety Program. Macon Lake Dam (MO 10153), Grand - Chariton Basin, Macon County, Missouri. Phase I Inspection Report.

Rey S Decker, Gordon Jamison, Garold Ulmer, Harold P Hoskins

Open publisher page 0 citations

Abstract

The purpose of the inspection was to make an assessment of the general conditions of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicate that the spillway does not meet the minimum criteria set forth in the recommended guidelines for an intermediate dam having a high hazard potential. The Probable Maximum Flood is the appropriate spillway design flood. The spillway will pass the 100-year flood (a flood having a 1 percent probability of being exceeded in any year) without overtopping the dam. The spillway will pass 55 percent of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. The height of the dam should be increased and/or the spillway size or shape should be changed to pass the Probable Maximum Flood without overtopping the dam.

About this research paper

What this paper is about

The purpose of the inspection was to make an assessment of the general conditions of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicate that the spillway does not meet the minimum criteria set forth in the recommended guidelines for an intermediate dam having a high hazard potential. The Probable Maximum Flood is the appropriate spillway design flood. The spillway will pass the 100-year flood (a flood having a 1 percent probability of being exceeded in any year) without overtopping the dam. The spillway will pass 55 percent of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. The height of the dam should be increased and/or the spillway size or shape should be changed to pass the Probable Maximum Flood without overtopping the dam.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The purpose of the inspection was to make an assessment of the general conditions of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicate that the spillway does not meet the minimum criteria set forth in the recommended guidelines for an intermediate dam having a high hazard potential. The Probable Maximum Flood is the appropriate spillway design flood. The spillway will pass the 100-year flood (a flood having a 1 percent probability of being exceeded in any year) without overtopping the dam. The spillway will pass 55 percent of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. The height of the dam should be increased and/or the spillway size or shape should be changed to pass the Probable Maximum Flood without overtopping the dam.

Key concepts: Spillway, Flood myth, Dam failure, Dam break, Hydrology (agriculture), Arch dam, Environmental science, Detention basin

Related papers

Back to paper searchBrowse research topicsOriginal source
National Dam Safety Program. Macon Lake Dam (MO 10153), Grand - Chariton Basin, Macon County, Missouri. Phase I Inspection Report. — Research Paper | ScholarLens