This study aims to review the use of vertical datumand determine the elevation of seawall constructions based on thesea level design. The sea level design used as a vertical referenceis MSL and LWS. The elevation of the seawall construction fromthe two references above then compared to the elevation of theseawall construction listed in the as built drawing documentduring construction. The MSL value is obtained from the tidalanalysis by using Doodson method based on direct observationfor 39 hours, while the LWS value is obtained by taking intoaccount the position of the range of tide at Tide Station inMakassar. Seawall elevation is obtained by terrestrialmeasurements using the Total Station by measuring the height ofthe top position of the seawall construction against the sea leveldesign through the Bench Mark. The seawall top elevation datacollection is done every one meter along 274 meters. The resultsobtained from measuring seawall construction elevation are +2,251 meters if using reference to MSL and +2,911 meters if usinga reference to LWS, while the elevation in the as built drawingdocument is +4,000 meters unknown what vertical reference isused as a reference.

Open-access reader

About this research paper

What this paper is about

This study aims to review the use of vertical datumand determine the elevation of seawall constructions based on thesea level design. The sea level design used as a vertical referenceis MSL and LWS. The elevation of the seawall construction fromthe two references above then compared to the elevation of theseawall construction listed in the as built drawing documentduring construction. The MSL value is obtained from the tidalanalysis by using Doodson method based on direct observationfor 39 hours, while the LWS value is obtained by taking intoaccount the position of the range of tide at Tide Station inMakassar. Seawall elevation is obtained by terrestrialmeasurements using the Total Station by measuring the height ofthe top position of the seawall construction against the sea leveldesign through the Bench Mark. The seawall top elevation datacollection is done every one meter along 274 meters. The resultsobtained from measuring seawall construction elevation are +2,251 meters if using reference to MSL and +2,911 meters if usinga reference to LWS, while the elevation in the as built drawingdocument is +4,000 meters unknown what vertical reference isused as a reference.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This study aims to review the use of vertical datumand determine the elevation of seawall constructions based on thesea level design. The sea level design used as a vertical referenceis MSL and LWS. The elevation of the seawall construction fromthe two references above then compared to the elevation of theseawall construction listed in the as built drawing documentduring construction. The MSL value is obtained from the tidalanalysis by using Doodson method based on direct observationfor 39 hours, while the LWS value is obtained by taking intoaccount the position of the range of tide at Tide Station inMakassar. Seawall elevation is obtained by terrestrialmeasurements using the Total Station by measuring the height ofthe top position of the seawall construction against the sea leveldesign through the Bench Mark. The seawall top elevation datacollection is done every one meter along 274 meters. The resultsobtained from measuring seawall construction elevation are +2,251 meters if using reference to MSL and +2,911 meters if usinga reference to LWS, while the elevation in the as built drawingdocument is +4,000 meters unknown what vertical reference isused as a reference.

Key concepts: Seawall, Elevation (ballistics), Geotechnical engineering, Hydrology (agriculture), Metre, Environmental science, Geology, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Tinjauan Elevasi Puncak Bangunan Seawall di Pantai Galesong Utara — Research Paper | ScholarLens