Variable Neighborhoods Search for Multi-Site Production Planning
Agung Mustika Rizki, Gusti Eka Yuliastuti, Wayan Firdaus Mahmudy, Ishardita Pambudi Tama
Abstract
Open-access reader
Agung Mustika Rizki, Gusti Eka Yuliastuti, Wayan Firdaus Mahmudy, Ishardita Pambudi Tama
Abstract
Open-access reader
In the home textile industry, production planning needs to be done so that the production costs incurred by the company can be well controlled. Production planning is a problem that cannot be solved in a short time. Problems are more complex if the company has several production branches in other cities, with rules and standards that are certainly very different from one city to another. Based on this background, an algorithm is needed that can solve production planning problems for companies with many production branches in order to obtain optimal solutions. VNS is applied by the author and produces an optimal and efficient solution because the time needed is relatively short compared to the planning carried out previously by the company.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In the home textile industry, production planning needs to be done so that the production costs incurred by the company can be well controlled. Production planning is a problem that cannot be solved in a short time. Problems are more complex if the company has several production branches in other cities, with rules and standards that are certainly very different from one city to another. Based on this background, an algorithm is needed that can solve production planning problems for companies with many production branches in order to obtain optimal solutions. VNS is applied by the author and produces an optimal and efficient solution because the time needed is relatively short compared to the planning carried out previously by the company.
Key concepts: Production (economics), Production planning, Variable (mathematics), Order (exchange), Computer science, Operations research, Business, Operations management