Application of Managed Pressure Drilling on a Semisubmersible Tender-Assisted Rig to Address Drilling Challenges in HPHT Gas Condensate Wells, Offshore Vietnam

Harpreet Kaur Dalgit Singh, Bao Ta Quoc, Tan Chai Yong, Do Van Khanh, Nguyễn Xuân Cường, Hoàng Thanh Tùng, Truong Hoai Nam, Ngo Huu Hai, Đặng Anh Tuấn, Trinh Ngoc Bao, Tran Nam Hung, Nguyen Pham Cuong

Open publisher page 4 citations

Abstract

Abstract High-pressure, high-temperature (HP/HT) environments often present kick and losses scenarios. Bien Dong POC Well-1 serves as an example of such scenarios with a very narrow-pressure operating window. Operational pressure challenges prohibited achieving the objectives. While drilling the Bien Dong Well-1, the well encountered ballooning issues, high pore pressures, and a narrow window. As part of remedial actions when drilling Bien Dong Well-2 & Well-3, the Bien Dong POC drilling team decided to deploy MPD technology with constant bottomhole pressure and early kick-loss detection capabilities. By applying MPD techniques, the team drilled the 12-1/4-in. hole section with the lowest possible mud weight to accommodate the narrow drilling window. Drilling the well sections to total depth (TD) took only 10 days in Well-2 and 14 days in Well-3. MPD also allowed stripping out of the hole with surface backpressure (SBP) instead of pumping out of the hole to minimize swab once in shoe, which reduced trips for considerable rig-time savings. The wells were drilled using MPD technology on a semisubmersible tender-assisted rig. A comprehensive rig survey was conducted during the planning phase of rig construction. The survey outlined the permanent installation of the MPD system, including an automated MPD choke manifold and docking-station rotating control device (RCD). The MPD equipment was integrated into the rig on a flexible plug-and-play basis to enable easy rig up and rig down. The integration also enabled moving the equipment between wells when the rig skids and during the MPD operation. The success of MPD operations came through cooperation with team members, experience from lessons learned, and excellence in rig crew performance on well after well. This paper will discuss how MPD technology led to campaign improvements and cost savings throughout Bien Dong Well-2 and Well-3.

About this research paper

What this paper is about

Abstract High-pressure, high-temperature (HP/HT) environments often present kick and losses scenarios. Bien Dong POC Well-1 serves as an example of such scenarios with a very narrow-pressure operating window. Operational pressure challenges prohibited achieving the objectives. While drilling the Bien Dong Well-1, the well encountered ballooning issues, high pore pressures, and a narrow window. As part of remedial actions when drilling Bien Dong Well-2 & Well-3, the Bien Dong POC drilling team decided to deploy MPD technology with constant bottomhole pressure and early kick-loss detection capabilities. By applying MPD techniques, the team drilled the 12-1/4-in. hole section with the lowest possible mud weight to accommodate the narrow drilling window. Drilling the well sections to total depth (TD) took only 10 days in Well-2 and 14 days in Well-3. MPD also allowed stripping out of the hole with surface backpressure (SBP) instead of pumping out of the hole to minimize swab once in shoe, which reduced trips for considerable rig-time savings. The wells were drilled using MPD technology on a semisubmersible tender-assisted rig. A comprehensive rig survey was conducted during the planning phase of rig construction. The survey outlined the permanent installation of the MPD system, including an automated MPD choke manifold and docking-station rotating control device (RCD). The MPD equipment was integrated into the rig on a flexible plug-and-play basis to enable easy rig up and rig down. The integration also enabled moving the equipment between wells when the rig skids and during the MPD operation. The success of MPD operations came through cooperation with team members, experience from lessons learned, and excellence in rig crew performance on well after well. This paper will discuss how MPD technology led to campaign improvements and cost savings throughout Bien Dong Well-2 and Well-3.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract High-pressure, high-temperature (HP/HT) environments often present kick and losses scenarios. Bien Dong POC Well-1 serves as an example of such scenarios with a very narrow-pressure operating window. Operational pressure challenges prohibited achieving the objectives. While drilling the Bien Dong Well-1, the well encountered ballooning issues, high pore pressures, and a narrow window. As part of remedial actions when drilling Bien Dong Well-2 & Well-3, the Bien Dong POC drilling team decided to deploy MPD technology with constant bottomhole pressure and early kick-loss detection capabilities. By applying MPD techniques, the team drilled the 12-1/4-in. hole section with the lowest possible mud weight to accommodate the narrow drilling window. Drilling the well sections to total depth (TD) took only 10 days in Well-2 and 14 days in Well-3. MPD also allowed stripping out of the hole with surface backpressure (SBP) instead of pumping out of the hole to minimize swab once in shoe, which reduced trips for considerable rig-time savings. The wells were drilled using MPD technology on a semisubmersible tender-assisted rig. A comprehensive rig survey was conducted during the planning phase of rig construction. The survey outlined the permanent installation of the MPD system, including an automated MPD choke manifold and docking-station rotating control device (RCD). The MPD equipment was integrated into the rig on a flexible plug-and-play basis to enable easy rig up and rig down. The integration also enabled moving the equipment between wells when the rig skids and during the MPD operation. The success of MPD operations came through cooperation with team members, experience from lessons learned, and excellence in rig crew performance on well after well. This paper will discuss how MPD technology led to campaign improvements and cost savings throughout Bien Dong Well-2 and Well-3.

Key concepts: Drilling, Drilling rig, Offshore drilling, Marine engineering, Choke, Engineering, Window (computing), Well control