Environmental Assessment for the Construction and Operation of a Battalion Headquarters for the U.S. Army Priority Air Transport at Joint Base Andrews-Naval Air Facility Washington, Prince George's County, Maryland

Michelle Cannella, Jennifer Jarvis, Tim Lavallee, Bonnie Licking, Martha Martin, Samuel Pett, David Postlewaite, Jeff Strong, Linda Tafazoli

Open publisher page 0 citations

Abstract

Abstract : The purpose of the Proposed Action is to provide a facility adequate to meet USAPAT's mission requirements. USAPAT currently occupies Building 1778, a temporary facility of approximately 6,900 square feet (SF) that was built in 1988 to accommodate a small detachment of Soldiers. USAPAT is now a much larger organization with more than 70 personnel assigned to JBA. The size, configuration, and condition of Building 1778 are inadequate to meet USAPAT's mission requirements. A larger, modern facility is needed so that the battalion can train properly and conduct its mission responses unhampered. The phone lines are analog, there are not enough LAN ports in the building, both male and female latrines are inadequate, and heating and air conditioning run off three separate units that are antiquated and prone to breaking down at seasonal changes. Under the No Action Alternative, no new facility would be constructed and the USAPAT functions at JBA would continue to operate out of Building 1778. This EA has been prepared to evaluate the Proposed Action and the No Action Alternative. All resources are considered in the impact analysis.

About this research paper

What this paper is about

Abstract : The purpose of the Proposed Action is to provide a facility adequate to meet USAPAT's mission requirements. USAPAT currently occupies Building 1778, a temporary facility of approximately 6,900 square feet (SF) that was built in 1988 to accommodate a small detachment of Soldiers. USAPAT is now a much larger organization with more than 70 personnel assigned to JBA. The size, configuration, and condition of Building 1778 are inadequate to meet USAPAT's mission requirements. A larger, modern facility is needed so that the battalion can train properly and conduct its mission responses unhampered. The phone lines are analog, there are not enough LAN ports in the building, both male and female latrines are inadequate, and heating and air conditioning run off three separate units that are antiquated and prone to breaking down at seasonal changes. Under the No Action Alternative, no new facility would be constructed and the USAPAT functions at JBA would continue to operate out of Building 1778. This EA has been prepared to evaluate the Proposed Action and the No Action Alternative. All resources are considered in the impact analysis.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract : The purpose of the Proposed Action is to provide a facility adequate to meet USAPAT's mission requirements. USAPAT currently occupies Building 1778, a temporary facility of approximately 6,900 square feet (SF) that was built in 1988 to accommodate a small detachment of Soldiers. USAPAT is now a much larger organization with more than 70 personnel assigned to JBA. The size, configuration, and condition of Building 1778 are inadequate to meet USAPAT's mission requirements. A larger, modern facility is needed so that the battalion can train properly and conduct its mission responses unhampered. The phone lines are analog, there are not enough LAN ports in the building, both male and female latrines are inadequate, and heating and air conditioning run off three separate units that are antiquated and prone to breaking down at seasonal changes. Under the No Action Alternative, no new facility would be constructed and the USAPAT functions at JBA would continue to operate out of Building 1778. This EA has been prepared to evaluate the Proposed Action and the No Action Alternative. All resources are considered in the impact analysis.

Key concepts: George (robot), Joint (building), Engineering, Archaeology, Operations research, Geography, History, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Environmental Assessment for the Construction and Operation of a Battalion Headquarters for the U.S. Army Priority Air Transport at Joint Base Andrews-Naval Air Facility Washington, Prince George's County, Maryland — Research Paper | ScholarLens