Optimization of Process Flow in an Assembly Line of Manufacturing Unit through Lean Tools Execution
S. Nallusamy, Vadivel Saravanan
Abstract
S. Nallusamy, Vadivel Saravanan
Abstract
The main aim of this study is to achieve the maximum productivity in an assembly line of a valve manufacturing industry through the implementation of different lean tools to minimize the production time. The existing manufacturing data were collected and interpret the information’s for identifying the gaps for productivity improvement. For obtaining the production line performance we shall introduce a solution after finding the problemswhich affects the lead time. In this research, an attempt was made to introduce a new fixture with appropriate lean methods by focusing on value stream mapping, kaizen etc to eliminate different kinds of lead times consuming phases in the overall process. Designing a fixture for the process is also done in Kaizen, in order to exclude the sub operations. After execution of various lean tools the total cycle time was reduced about 10.49 minutes and the productivity was improved about 20% by eliminating all those non value added activities in the operations to meet the customer demand.
OpenAlex reports 15 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main aim of this study is to achieve the maximum productivity in an assembly line of a valve manufacturing industry through the implementation of different lean tools to minimize the production time. The existing manufacturing data were collected and interpret the information’s for identifying the gaps for productivity improvement. For obtaining the production line performance we shall introduce a solution after finding the problemswhich affects the lead time. In this research, an attempt was made to introduce a new fixture with appropriate lean methods by focusing on value stream mapping, kaizen etc to eliminate different kinds of lead times consuming phases in the overall process. Designing a fixture for the process is also done in Kaizen, in order to exclude the sub operations. After execution of various lean tools the total cycle time was reduced about 10.49 minutes and the productivity was improved about 20% by eliminating all those non value added activities in the operations to meet the customer demand.
Key concepts: Kaizen, Value stream mapping, Lean manufacturing, Fixture, Manufacturing engineering, Lead time, Productivity, Production line