Application Research on Bridge Based on High Efficiency Prefabricated Assembly Construction Technology
Fengwei Wang
Abstract
Fengwei Wang
Abstract
Based on the analysis of the construction process of prefabricated construction process and it is applied to bridge construction,so as to realize the efficient construction of bridge construction.It not only has high precision in construction control and ensure the construction safety,but also can make wet operation reduce greatly,and it is conducive to environmental protection and reduce construction people,especially it can reduce material and energy waste.And provide reliable technical reference for the construction of the project.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the analysis of the construction process of prefabricated construction process and it is applied to bridge construction,so as to realize the efficient construction of bridge construction.It not only has high precision in construction control and ensure the construction safety,but also can make wet operation reduce greatly,and it is conducive to environmental protection and reduce construction people,especially it can reduce material and energy waste.And provide reliable technical reference for the construction of the project.
Key concepts: Bridge (graph theory), Construction waste, Construction engineering, Prefabrication, Process (computing), Engineering, Building construction, Civil engineering